Permit: T03BU03106
Permit Details
Apply Date:
12/10/2003
Applicant:
RICK ENGINEERING
Description:
GRADING:0 CY CUT & 4000 CY FILL
Contractors:
- CANYON BUILDING AND DESIGN L L C
Permit Reviews
Permit Number - T03BU03106
Permit Status: Final
Permit Description: GRADING:0 CY CUT & 4000 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/05/2004 | RESUBMITTAL | 03/29/2004 | COMPLETED |
04/01/2004 | RESUBMITTAL - GRADING | 04/23/2004 | COMPLETED |
12/10/2003 | PLANS OK TO SUBMIT - GRADING | 12/11/2003 | COMPLETED |
12/11/2003 | GRADING | 01/13/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03BU03106
Permit Status: Final
Permit Description: GRADING:0 CY CUT & 4000 CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/10/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T03BU03106
Permit Description: GRADING:0 CY CUT & 4000 CY FILL
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
05/25/2005 | STORMWATER INSTALL OF CONTROLS | JSALINE | Approved | SPOKE WITH SITE SUPERINTENDENT OVER THE PHONE REGARDING A MEETING ON FRIDAY THE 27TH. WE WILL MEET ONSITE @ 11:00 A.M. TO REVIEW THE PLANS. I DO NOT HAVE A SET OF PLANS FOR THIS SITE. PLANS ARE UNDER THE ORIGINAL GRADING PLAN IN 2003. A COPY WILL BE MADE AFTER OBTAINING CONTRACTORS SET. CONTRACTOR EXPLAINED HE HAS BRIDGE STRUCTURES ON BACK ORDER, NO FURTHER ACTIVITY AT THIS TIME. |
07/25/2005 | STORMWATER FOLLOW-UP INSP | JSALINE | Approved | SWPPP CONTROLS HAVE NOW BEEN INSTALLED TO CONTROL EROSION WITHIN THE SIDES OF ALAMO WASH AND THE STOCK PILE LOCATED WITHIN THE PARKING LOT. STOCK PILES WITHIN THE CHANNEL HAVE NOW BEEN REMOVED, HOWEVER EXCESS SEDIMENT NEEDS TO BE REMOVED FROM THE BOTTOM OF THE CHANNEL JUST WEST OF THE BRIDGE. |
11/04/2005 | GRADING - FINAL | DROBERTS | Approved | THIS SITE IS NOT READY AT THIS TIME. THE CONTRACTOR CONTINUES TO WORK ON THE ELECTRICAL WORK FOR THE LIGHTS ADJACENT TO THE BRIDGE STRUCTURE. I MET WITH BOBBY/CANYON DEVELOPMENT AND LOOKED AT THE SITE. I HAVE ASKED THAT HE HAVE A CREW CLEAN ALL OF THE CONSTRUCTION TRASH FROM THE WASH, ALONG WITH CONCRETE MATERIAL THAT IS LYING ON THE BANKS UNDERNEATH THE BRIDGE STRUCTURE. ALSO TO PLACE ADDITIONAL MATERIAL IN THE AREAS ADJACENT TO THE INLET STRUCTURES INTO THE WASH TO PREVENT EROSION UNTIL THE REST OF THE PROJECT IS COMPLETE. |
11/04/2005 | LANDSCAPE INSPECTION | ACONNOR | Approved | Plant Establishment Guarantee must be met for approval. A stand of vegetation shall be considered established when a minimum of one (1) perennial seeded species per square foot has rooted. |
02/06/2014 | STORMWATER FINAL INSPECTION | LHANLY | Approved |