Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2014 |
GRADING - FINAL |
|
Approved |
|
| 04/20/2006 |
GRADING - FINAL |
|
Partial Approval |
THIS SITE IS NOT READY AT THIS TIME. I HAVE ASKED THAT THE FOLLOWING ITEMS BE COMPLETED PRIOR TO THE FINAL RELEASE OF THIS SITE. 1) REMOVE ALL OF THE REMAINING CONSTRUCTION TRASH AND DEBRIS FROM THE WASH, ALONG WITH CONCRETE MATERIAL THAT IS LYING ON THE BANKS UNDERNEATH THE BRIDGE STRUCTURE. 2) PLACE ADDITIONAL MATERIAL IN THE AREAS ADJACENT TO THE INLET STRUCTURES INTO THE WASH TO PREVENT EROSION UNTIL THE REST OF THE PROJECT IS COMPLETE. |
| 11/04/2005 |
GRADING - FINAL |
|
Partial Approval |
THIS SITE IS NOT READY AT THIS TIME. THE CONTRACTOR CONTINUES TO WORK ON THE ELECTRICAL WORK FOR THE LIGHTS ADJACENT TO THE BRIDGE STRUCTURE. I MET WITH BOBBY/CANYON DEVELOPMENT AND LOOKED AT THE SITE. I HAVE ASKED THAT HE HAVE A CREW CLEAN ALL OF THE CONSTRUCTION TRASH FROM THE WASH, ALONG WITH CONCRETE MATERIAL THAT IS LYING ON THE BANKS UNDERNEATH THE BRIDGE STRUCTURE. ALSO TO PLACE ADDITIONAL MATERIAL IN THE AREAS ADJACENT TO THE INLET STRUCTURES INTO THE WASH TO PREVENT EROSION UNTIL THE REST OF THE PROJECT IS COMPLETE. |
| 11/03/2005 |
GRADING - FINAL |
|
Cancelled |
IVRS - AP canceled |