Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T03BU03106
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2014 | STORMWATER FOLLOW-UP INSP | Approved | ||
07/25/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | SWPPP CONTROLS HAVE NOW BEEN INSTALLED TO CONTROL EROSION WITHIN THE SIDES OF ALAMO WASH AND THE STOCK PILE LOCATED WITHIN THE PARKING LOT. STOCK PILES WITHIN THE CHANNEL HAVE NOW BEEN REMOVED, HOWEVER EXCESS SEDIMENT NEEDS TO BE REMOVED FROM THE BOTTOM OF THE CHANNEL JUST WEST OF THE BRIDGE. | |
07/20/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE SUPER HAS BEEN INSTRUCTED TO REMOVE DIRT SPOILS WITHIN THE ALAMO WASH AND PROTECT CURB CUT INLETS FROM STORM WATER EROSION INTO ALAMO WASH. WILL RE-INSPECT ON FRIDAY, JULY 22ND. | |
07/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS MOVING ALONG IN CONSTRUCTION. BRIDGE IS CONSTRUCTED ACROSS THE WASH. CONTACTED MIKE WILLHIGHT AND REQUESTED TO HAVE STRAW WADDLES PLACED AT THE BASE OF THE STOCKPILE LOCATED WITHIN THE PARKING AREA. ALSO REQUESTED TO HAVE THE LOOSE SEDIMENT REMOVED FROM THE INSIDE OF CURB. CHANNEL HAS BEEN CLEANED OUT OF MOST DEBRI AND TRASH. | |
06/09/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS TO BEGIN CONSTRUCTION WITHIN THE WASH ON MONDAY. INSPECTIONS WILL COMMENCE ON THIS DAY FOR THE INSTALLATION OF THE BRIDGE. | |
05/31/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | INVESTIGATE SWPPP FOR THIS SITE IN PLANS AND RECORDS AT 201 N. STONE. DID NOT FIND A SWPPP FOR THIS SITE ON FILM. INSPECTED STORM WATER CONTROLS ON SITE AND FOUND SIGNIFICANT EROSION COMING FROM THE PARKING LOT TO THE S. REQUESTED TO HAVE A MEETING ON THE 1ST. OF JUNE WITH SITE SUPERINTENDENT, MIKE WITH CANYON BUILDERS TO GO OVER THE REQUIRED STORM WATER CONTROLS. | |
05/25/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH STEVE, (SITE SUPERINTENDENT), TO FOLLOW-UP ON SOME OF THE FINAL GRADING AND STORM WATE ISSUES. STEVE AGREED TO ROCK-RIP-RAP AN AREA OF CONCERN LOCATED ADJACENT TO THE NORTHERN DRAINAGE CHANNEL. ALSO DRAINAGE CHANNEL NEEDS TO HAVE DEBRI AND CONSTRUCTION REMOVED. FOLLOW-UP WILL OCCUR IN TWO WEEKS. |