Permit: T02CM04230
Permit Details
Status:
Final
Type:
DUPLEX NEW
Address:
1245 S CAMINO DEL SIERRA #01
Address NEW:
1245 S CAMINO DEL SIERRA #01
Apply Date:
09/09/2002
Applicant:
TINAJAS BUILDING COMPANY, LLC
Description:
DUPLEX:TD#15-53-34
Outstanding Activity Conditions
Permit Number - T02CM04230
Permit Status: Final
Permit Description: DUPLEX:TD#15-53-34
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/09/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T02CM04230
Permit Description: DUPLEX:TD#15-53-34
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2002 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000* |
| 10/02/2002 | ELECTRIC - UFER | JORTA | Approved | IVRS - Inspection 0000* |
| 10/07/2002 | BUILDING PRE-SLAB | AMATHIES | Approved | IVRS - Inspection 0000* |
| 10/07/2002 | EXCAVATION/LAYOUT REBAR & ZON | AMATHIES | Approved | IVRS - Inspection 0000* |
| 10/24/2002 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection 0000* |
| 10/24/2002 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection 0000*1.) SDR SEWER SHADED OK OK TO COVER WITH NATIVE SOILS 2.) PVC YARDWATER SHADED OK TO COVER NATIVE SOILS. |
| 11/08/2002 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000* |
| 11/08/2002 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
| 11/08/2002 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection 0000* |
| 11/12/2002 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection 0000* 1.) FOR FINAL AIR HANDLER COMPLETE ELECT. DATA W/PROPER AUX. HT STRIP. PLATE. APT #2 CARRIER A/H. CLEAR BOTH 2.) ACCESS PANEL IN FRONT, REFRIG LINES, GALV. STRAPS, ETC. 3.) REFRIG. LINES DO NOT ALLOW STEEL TO TOUCH COPPER DO NOT NEED LEAKS. 4.) OUTSIDE FRESH AIR? CONSULT 1999. IMC. |
| 11/12/2002 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection 0000* |
| 11/13/2002 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection 0000* 1.) ABS DWV THRU ROOF OK WATER TEST OK 2.) PEX PIPING OK PRESSURE TEST OK 3.) TUBS OK 4.) CLOSET FLANGES OK 5.) OK TO COVER WALLS. 6.) CONTRACTOR WILL HAVE PLUMBER REPLACE NIAL GUARDS ON BOTTOM PLATE WITH FHA STRAPS. |
| 11/22/2002 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection 0000* |
| 11/22/2002 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection 0000*SHEAR WALLS NOT NAILED PER DETAIL 2.) FIRE STOP ALL PENETRATIONS IN FIRE WALL 3.) FIRE STOP REQUIRED ON FIRE WALL WHERE JOINTS EXCEED 1/16" NON - TIGHT CONST. 4.) DO NOT TAPE OR MUD FIRE OR SHEAR WILL UNTIL. FIRE STOP INSPECTION IS COMPLETE. |
| 11/29/2002 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
| 01/16/2003 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection 0000*SENT TO TEP 1/17/03 AT 9:15AM OK CABLE DROP ONLY. UNITS 1 & 2 NOTES 1.) PRIOR TO RELEASE OF POWER, A UNSPLICED GROUNDING ELECTROD CONDUCTOR TO BE INSTALLED FROM UFER TERMINATION POINT AT SERVICE #2. 2.) ALSO INSTALL BOND BUSHING AT ALL CONNECTORS WHERE UNPROTECTED CONDUCTORS PASS THRU. |
| 01/23/2003 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection 0000*SENT TO TEP ON 1/24/03 AT 9:15AM OK TO CLEAR OK CABLE DROP. UNITS #1 & 2. |
| 01/23/2003 | ELECTRIC - TEMPORARY SERVICE | DSANTACR | Approved | |
| 01/28/2003 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 01/28/2003 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection 0000*/ 1) PLUMBING FINAL-OK 2) OK FOR C OF O PENDING ANY OTHER INSPECTION |
| 01/31/2003 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection 0000* |
| 02/05/2003 | PERMIT FINALED | AMATHIES | Approved | |
| 02/05/2003 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved |