Permit Reviews
Permit Number - T02CM00963
Permit Status: C of o
Permit Description: TI:OFFICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/07/2003 | 3RD PARTY REVIEW-REVISION/OTHER | 07/22/2003 | COMPLETED |
07/23/2002 | 3RD PARTY COMMERCIAL TI | 09/09/2002 | COMPLETED |
09/11/2002 | RESUBMITTAL | 01/17/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T02CM00963
Permit Status: C of o
Permit Description: TI:OFFICE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/19/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T02CM00963
Permit Description: TI:OFFICE
Total Completed Inspections - 40
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2003 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000*1.) BLDG "A" UNDERGROUND EAST SIDE FIRST FLOOR OK 4" GREASE LINE TO EAST SIDE UNDERGROUND TO OUT SIDE OK WATER TEST OK 3.) OK TO COVER THIS AREA. |
07/14/2003 | ROOF NAILING | AMATHIES | Approved | IVRS - Inspection 0000* |
07/23/2003 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | 1) 4" DIP TO MANHOLE-OK, OK TO COVER |
09/08/2003 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
09/15/2003 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
11/04/2003 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection 0000*/ 1) SECOND FLOOR PLUMBING OK 2) NEED TO SEE CLOSET FLANGES 3) OK TO COVER NAILS |
11/07/2003 | REINFORCED MASONRY PRE-GROUT | AMATHIES | Approved | IVRS - Inspection 0000*/ MECH. YARD SCREEN WALL. |
12/03/2003 | ELECTRIC - INTERMEDIATE | MCAPISTR | Approved | IVRS - Inspection 0000*/ BLDG A - 1ST FLR BAGGAGE AREA. |
12/03/2003 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection 0000* LIGHT POLE BASE NORTH END |
12/12/2003 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection 0999*/ 1) 307.2.3 AUX. DRAIN PANS 2) 307.1 CANNOT RED. DRAIN LINE CONNECTIONS 3) CW5 AND R 101 PSI-BLDG A, HW5 91-BLDG A AND R 98-BLDG A 4) CORRECTIONS REQUIRED 307.1 CAN'T REDUCE DRAIN LINES TO SMALLER THAN UNIT NOZZLE SIZE 5) 302.2.3 NEED AUXILARY DRAIN PANS UNDER ALL EVAPORATOR OR CHILLED WITH WATER COILS |
12/12/2003 | ELECTRIC - UNDERGROUND | MCAPISTR | Approved | IVRS - Inspection 0000*/ ONGOING EXCAVATION AND INSTALLATION OF PVC FOR YARD AND WALKWAY LIGHTING. |
12/16/2003 | FRAMING | HLEYVA | Approved | IVRS - Inspection 0000* 1) HAT CHANNEL @ PORCH EAST END. 2) OK |
12/22/2003 | ELECTRIC - ABOVE CEILING | MCAPISTR | Approved | IVRS - Inspection 0000*/ 1) SECURE THE ENGINEERS/ARCHITECTS APPROVAL IN WRITTING APPROVING THE EXTENDED USE OF M.C. CABLE FOR FIXTURE WIRING. 2) REMOVE LOW VOLTAGE SECONDARY WIRING FROM INTERIOR OF HIGH [LINE] VOLTAGE BOX. 3) PROVIDE MIN. 16X16 ACCESS HOLE TO ATTICS. |
12/30/2003 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection 0000* BATHROOMS OK BUILDING A |
01/08/2004 | ELECTRIC - CABLE DROP | MCAPISTR | Approved | 1) BOND REQUIRED FOR TEMP POWER |
01/09/2004 | MECHANICAL - TEMP PWR FOR TEST | CWILLIAM | Approved | |
01/09/2004 | PLUMBING - TEMP POWER FOR TEST | RMYERS | Approved | |
01/09/2004 | ELECTRIC - TEMP POWER FOR TEST | MCAPISTR | Approved | |
01/09/2004 | BUILDING - TEMP POWER FOR TEST | HLEYVA | Approved | |
03/08/2004 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection 0000*/ 2" GAS TO B-1 OK. PRESSURE TEST OK. |
03/08/2004 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection 0000* |
03/11/2004 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection 0000* |
04/16/2004 | ENGINEERING - FINAL | JBRUCKME | Approved | |
04/16/2004 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection 0000* |
04/16/2004 | ENGINEERING - FINAL | JBRUCKME | Approved | |
04/20/2004 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | 1) OK FOR C OF O |
04/21/2004 | FIRE - FINAL | LTHOMAS | Approved | |
04/21/2004 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
07/21/2004 | ELECTRIC - FINAL | RSUBA | Approved | IVRS - Inspection :* |
07/26/2004 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
07/27/2004 | ELECTRIC - UFER | RSUBA | Approved | |
07/30/2004 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | |
08/11/2004 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :*/1)PLUMBING FINAL OK 2)OK FOR C OF O PENDING ANY OTHER INSPECTION |
08/26/2004 | RIGHT OF WAY - FINAL | THARVISO | Approved | |
09/03/2004 | STEM WALL/RETAINING WALL | AMATHIES | Approved | |
09/03/2004 | BUILDING PRE-SLAB | AMATHIES | Approved | |
09/03/2004 | EXT METAL CLIPS/EXT SHEATHING | AMATHIES | Approved | |
09/03/2004 | BUILDING ABOVE CEILING | AMATHIES | Approved | |
09/03/2004 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection :* |
09/13/2004 | PERMIT FINALED | TACHONG | Approved |