Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T02CM00963
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/11/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/1)PLUMBING FINAL OK 2)OK FOR C OF O PENDING ANY OTHER INSPECTION |
|
08/06/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) CAP OFF HOSE BIBS CORRECTLY REQUESTED ON 7/29/04 2) ON 4/16/04 INSPECTOR GAVE YOU THE HEADS UP ABOUT VERIFICATION OF GRADE-A LETTER FROM THE PLUMBING CONTRACTOR IS NOT ACCEPTABLE 3) ALL CLEANOUTS UTILIZING CHROME PLATED CLEANOUT COVERS REQUIRE COUNTER SUNK TAPPED PLUGS WITH MACHINE SCREW. RAISED SQUARE HEAD TEST PLUGS WITH A WOOD SCREW IS NOT ACCEPTABLE 4) REMOVABLE SERVICE PANEL ON EWC NEEDS TO BE REMOVABLE. UNABLE TO INSPECT PLUMBING BEHIND PANEL 5) INSPECTED BEHIND BOTH EWC-OK | |
08/02/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) SEE NOTES FROM 4/16/04 AND 7/29/04 2) CONTRACTOR TO PAY RE-INSPECTION FEE | |
07/29/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) CAP OFF 1/2" H20 IN SOUTH AREA AND 3/4 H20 SAME AREA CORRECTLY 2) HAVE FLOOR CLEANOUTS TO GRADE WITH CORRECT COVERS 3) PROVIDE 4" PERM CAP ON 4" LAST IRON PIPING IN UPSTAIRS AHU ROOM IN SOUTH END | |
07/22/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :ANCHOR EXPANSION TANKS PROVIDE ACCESS TO WHA & TRAP PRIMERS CAP OFF 1 1/2" FUTURE WATER STUB REPAIR W/C 2ND FLOOR MENS |
|
07/09/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) E.R.M. OFF SET PVC PIPING AROUND COLUMN FOR LIGHT POLE 2) CORRECTIONS MADE OK 3) OK TO COVER | |
04/21/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
04/16/2004 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) PLBG IS COMPLETE. 2) CONTRACTOR NEEDS TO PROVIDE VERIFICATION OF GRADE ON SITE SEWER AND CERTIFICATION OF BACKFLOW DEVICES AND PLBG WILL BE COMPLETE. |