Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Permit Number - T02CM00963

Inspection Description - ELECTRIC - UNDERGROUND

Inspection Status - Approved

Date Description Inspector Results Comments
07/27/2004 ELECTRIC - UNDERGROUND Approved
06/30/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/ 1) OK 2 POLE BASES-NORTH
06/21/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/ OK 3 POLE BASES.
06/18/2004 ELECTRIC - UNDERGROUND Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 3 POLE BASES TO BE CLEANED OUT. COPPER UFER TO BE UNDER CONCRETE.
05/24/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/ WEST END PARKING APPROVED/
01/12/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ PARKING LOT POLE BASES ON N. SIDE [RAILS]. FIVE LOCS.
12/12/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ ONGOING EXCAVATION AND INSTALLATION OF PVC FOR YARD AND WALKWAY LIGHTING.
12/11/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000* CENTER COURT YARD LIGHTING & POWER.
12/03/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ POLE BASES BETWEEN BLDG C & D.
11/07/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) FRONT SITE LIGHTING
11/05/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) KEEP 18" OF COVER OVER PVC
11/04/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ TWO POLE STANDARD BASES WITH UFER.
11/03/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) TEP PRI. AND SECONDARY, PHONE AND TU RISERS (PVC)
10/30/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ TFRMR PRIMARY AND SECONDARY CONDUITS. 2ND FLOOR EAST.
10/29/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) 2ND FLOOR WEST END OF BLDG A
10/28/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*
10/27/2003 ELECTRIC - UNDERGROUND Not ready for Inspection IVRS - Inspection 0000*
10/24/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) SOUTH FRONT EXTERIOR BOLLARDS-TO POINT OF OFF SET AT BLDG A
10/22/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ PVC UNDERGROUND DESIGNATED AS PLANTER AREA MUST BE BURIED TO 18" DEPTH.
04/30/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*PVC TO BUILDING D FROM SES.
04/28/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*U/G CONDUIT FROM SES/TFRM. TO OTHER LOAD CENTER LOCATIONS. LAST BLDG. WEST.
04/02/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*STUB AT SES.
03/25/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*U/G PVC SECONDARY TO SES. 2.) PVC CONDUIT FOR BLDG. A, B & C.
3.) MISC. REFEED PVC.