Permit: T01CM03917
Permit Details
Apply Date:
08/09/2001
Applicant:
N/A
Description:
NEW:WAREHOUSE
Architects:
- VENEZIANO, PHILIP JOHN
Contractors:
- COBRE BUILDING SYSTEMS INC ,
Permit Reviews
Permit Number - T01CM03917
Permit Status: C of o
Permit Description: NEW:WAREHOUSE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/09/2001 | 3RD PARTY REVIEW-COMMERCIAL | 10/15/2001 | COMPLETED |
| 08/09/2001 | SITE | 10/10/2001 | COMPLETED |
| 10/10/2001 | SITE | 10/15/2001 | COMPLETED |
| 11/16/2001 | REVISION | 11/19/2001 | COMPLETED |
| 12/06/2001 | REVISION | 12/06/2001 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T01CM03917
Permit Description: NEW:WAREHOUSE
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2001 | ELECTRIC - INTERMEDIATE | JORTA | Approved | IVRS - Inspection 0000*APPROVED SLEEVE FOR |
| 12/07/2001 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection 0000* |
| 12/10/2001 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection 0000*1.) CORRECTIONS TO RPBP MADE OK OK TO COVER. |
| 12/12/2001 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection 0000*SIZED BIGGER THAN PLAN OK. |
| 12/13/2001 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000*1.) CONTRACTOR OBTAINED LETTER FROM ARCHETECT ALLOWING ABS IN LIEU OF PVC PVC DWV OK. WATER TEST OK. 2) INSPECTED PRE POUR OK FOR CONCRETE. |
| 12/13/2001 | BUILDING PRE-SLAB | DWITT | Approved | IVRS - Inspection 0000*MAIN BLDG. |
| 12/13/2001 | EXCAVATION/LAYOUT REBAR & ZON | DWITT | Approved | IVRS - Inspection 0000*BLDG TOE DN |
| 12/27/2001 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection 0000* |
| 12/27/2001 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000*1.) MAIN FRAME OK PER VISUAL INSPECTION I WILL NEED REPORT FROM SPECIAL INSPECTOR FOR FINAL. 2.) FIRE WALL FRAME OK. |
| 12/27/2001 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
| 12/31/2001 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection 0000*SHTROCK EXT EAST WALL. |
| 12/31/2001 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection 0000*NORTH & 2/3 OF WEST WALL . |
| 01/11/2002 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 01/13/2002 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection 0000*1.) ABS DWV OK WATER TEST OK 2.) COPPER WATER OK PRESSURE TEST OK 3.) GAS PIPING OK PRESSURE TEST OK 4.) OK TO COVER WALLS. |
| 01/16/2002 | ELECTRIC - CABLE DROP | MCAPISTR | Approved | IVRS - Inspection 0000* |
| 01/28/2002 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection 0000* |
| 01/30/2002 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 01/31/2002 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection 0000*1.) PLUMBING FINAL OK 2.) OK FOR C OF O PENDING ANY OTHER INSPECTION 3.) GAS NOT ON PERMIT, BUT PAID FOR PER |
| 02/22/2002 | ENGINEERING - FINAL | DROBERTS | Approved | |
| 02/22/2002 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection 0000*1.) AS NOTED ON 1/31/02 GAS IS PAID FOR AND APPROVED UCC LEFT AT METER ON 1/30/02. GAS IS ON AT THIS TIME THIS SHOULD CONCLUDE PAPERWORK FOR THIS ACTIVITY. |
| 02/22/2002 | ELECTRIC - FINAL | MCAPISTR | Approved | IVRS - Inspection 0000* |
| 02/22/2002 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000* |
| 02/22/2002 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000* |
| 02/25/2002 | PERMIT FINALED | DMANN | Approved | |
| 02/25/2002 | RIGHT OF WAY - FINAL | LLOPEZ | Approved |