Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T01CM03917

Parcel: 129051390


Addresses:

701 S CAMPBELL AV


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T01CM03917

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
12/13/2001 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection 0000*1.) CONTRACTOR OBTAINED LETTER FROM ARCHETECT ALLOWING ABS IN LIEU OF PVC PVC DWV OK. WATER TEST OK. 2) INSPECTED PRE POUR OK FOR CONCRETE.
12/04/2001 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*1.) I REVIEWED THE LETTER FROM THE ARCHECT ALLOWING ABS IN LIEU OF PVC.I FIND THIS ACCEPTABLE, HOWEVER, ALL CHANGES MADE TO THE PLAN MUST ALSO BE APPROVED BY THE CITY OF TUCSON PLAN REVIEWER, AND STAMPED APPROVED CROSSSING OUT A PIPE SIZE AND SUSITITUTING ANOTHER SIZE. IS NOT APPROVED. HAVE YOUR PLAN REVISED AND STAMPED, REFLECTING ALL CHANGES MADE TO THE PLAN. 2.) DRAIN FROM LOADING DOCK TO DAYLIGHT OK OK TO COVER.
12/03/2001 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*1.) NOT READY FOR INSPECTION.
12/02/2001 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*A. PLUMBING NOT INSTALLED PER PLAN 1.) BLDG SEWER MUST BE GRADED AT 2% 2.) READ NOTE #9 ON PLUMBING SCHEDULE MAT'1 TO BE SCH 40 PVC 3.) SEE DELTA ONE REVISION ON TOILET PLUMBING PLAN REQ'D 4" WASTE TO WASHERS ANY CHANGE TO PLAN MUST BE APPROVED.