Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
07/17/2001
Applicant:
N/A
Description:
SERVICE STATION:NEW
Architects:
  • BOTTOMLEY, THOMAS ROBERT
Contractors:
  • HAWORTH CORPORATION , THE

Permit Reviews

Permit Number - T01CM03501
Permit Status: C of o
Permit Description: SERVICE STATION:NEW
Start Date Submittal Complete Date Status  
07/17/2001 3RD PARTY REVIEW-COMMERCIAL 10/03/2001 COMPLETED Review Details
10/01/2001 SITE 10/03/2001 COMPLETED Review Details
11/21/2001 REVISION 11/27/2001 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T01CM03501
Permit Description: SERVICE STATION:NEW
Total Completed Inspections - 31
Date Description Inspector Results Comments
10/17/2001 PLUMBING - ROUGH, SOIL RMYERS Approved IVRS - Inspection 0000*1.) ABS UNDERGROUND OK .2) WATER TEST OK 3.) OK TO BACKFILL NOTE* INVERT REQUIRES ONE PERENT PITCH ON BLDG DRAIN.
10/24/2001 ELECTRIC - UFER JORTA Approved AT MAIN STORE.
10/24/2001 ELECTRIC - UFER JORTA Approved IVRS - Inspection 0000*
11/05/2001 ROOF NAILING LHANLY Approved IVRS - Inspection 0000*
11/05/2001 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved IVRS - Inspection 0000*
11/14/2001 SHEET ROCK NAILING DWITT Approved
11/16/2001 STUCCO MESH LHANLY Approved IVRS - Inspection 0000*
11/20/2001 STEM WALL/RETAINING WALL LHANLY Approved IVRS - Inspection 0000*
11/20/2001 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection 0000*
11/28/2001 PLUMBING - SEWER HCS CONNECT RMYERS Approved IVRS - Inspection 0000*1. 4" ABS SEWER FROM BACKWATER VALVE TO TIE-IN AT EXISTING OK WATER TEST OK 2.) OK TO COVER.
11/30/2001 MECHANICAL - INTERMEDIATE CWILLIAM Approved
11/30/2001 FRAMING LHANLY Approved IVRS - Inspection 0000*
12/03/2001 PLUMBING - YARD WTR LINE/TEST RMYERS Approved IVRS - Inspection 0000*1.) ALL CORRECTIONS MADE OK ON YARDWATER 2.) REMEMBER NO CONNECTIONS MAY BE MADE BETWEEN METER AND RPBP. 3.) OK TO COVER ALL AREAS OF YARDWATER PIPING.
12/07/2001 PLUMBING - ABOVE CEILING RMYERS Approved IVRS - Inspection 0000*1. 11/09/01 NOTE #2 CHECK VALVES OK 2.) OK FOR CEILING TILE.
12/07/2001 BUILDING ABOVE CEILING LHANLY Approved IVRS - Inspection 0000*
12/10/2001 MECHANICAL - ABOVE CEILING CWILLIAM Approved IVRS - Inspection 0000*
12/10/2001 ELECTRIC - ABOVE CEILING JORTA Approved IVRS - Inspection 0000*
12/13/2001 MECHANICAL - TEMP PWR FOR TEST CWILLIAM Approved
12/13/2001 PLUMBING - TEMP POWER FOR TEST RMYERS Approved IVRS - Inspection 0000*OK FOR TEMP POWER.
12/20/2001 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection 0000*
12/27/2001 SIGN - FINAL JYBARRA Approved IVRS - Inspection 0000*
12/27/2001 PLUMBING - FINAL RMYERS Approved
12/27/2001 PLUMBING - INTERMEDIATE RMYERS Approved 1.) CAR WASH INTERMEDIATE OK (ALL EXPOSED) 2.) CAR WASH FINAL OK PENDING ANY OTHER INSPECTIONS.3 .) PLUMBING FINAL FOR SERVICE STATION OK 4.) ALL RPBP CERTIFIED OK ON FILE OF TUCSON WATER. 5.) OK FOR C OF O. PENDING ANY OTHER INSPECTIONS.
12/27/2001 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection 0000*OK FOR C OF O.
12/27/2001 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection 0000*
12/27/2001 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection 0000*
12/28/2001 MECHANICAL - FINAL CWILLIAM Approved APPROVED
12/28/2001 BUILDING - FINAL LHANLY Approved IVRS - Inspection 0000*
01/02/2002 PERMIT FINALED ENGINEER Approved
01/02/2002 RIGHT OF WAY - FINAL ENGINEER Approved
01/02/2002 ENGINEERING - FINAL ENGINEER Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW