Permit: DP22-0188
Permit Details
Apply Date:
07/11/2022
Applicant:
Regina Beem
Description:
Site/Grading/Swppp/Floodplain - Cottonwood Substation, Tucson Electric Power Company.
Permit Reviews
Permit Number - DP22-0188
Permit Status: Issued
Permit Description: Site/Grading/Swppp/Floodplain - Cottonwood Substation, Tucson Electric Power Company.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/11/2022 | DEV PKG - OK TO SUBMIT | 07/27/2022 | COMPLETED |
07/27/2022 | DEV PKG | 09/08/2022 | COMPLETED |
11/10/2022 | DEVELOPMENT PACKAGE REVIEW v.2 | 01/03/2023 | REQUIRES RESUBMIT |
01/30/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 03/29/2023 | REQUIRES RESUBMIT |
04/14/2023 | DEVELOPMENT PACKAGE REVIEW v.4 | 07/14/2023 | APPROVED |
11/10/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/10/2022 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - DP22-0188
Permit Status: Issued
Permit Description: Site/Grading/Swppp/Floodplain - Cottonwood Substation, Tucson Electric Power Company.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
01/03/2023 | This project requires submission and approval of a Private Improvement Agreement (PIA) prior to issuance of this permit. |
07/10/2023 | As-builts required prior to final. As-builts include a record survey of equipment elevations to ensure 500 year elevation requirements and a top and bottom of proposed bank protection survey. |
07/10/2023 | PRIOR TO FINAL: Confirmation of soil conditions related to construction of bank protection and area outside of perimeter site wall required. |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP22-0188
Permite Description: Site/Grading/Swppp/Floodplain - Cottonwood Substation, Tucson Electric Power Company.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | Attended a pre-con with TEP for the substation at Cottonwood Lane. Inform the contractor to call in inspections every two weeks if needed inspections before the two weeks just call it in. |
01/24/2024 | ENGR - Drainage Structures | N/A | Not Ready | Spoke with Shawn explained to him that he needs to call building inspections to have screen wall rebar inspected. |