Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP22-0188
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Attended a pre-con with TEP for the substation at Cottonwood Lane. Inform the contractor to call in inspections every two weeks if needed inspections before the two weeks just call it in. |