Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
Permit Number - DP22-0188
Inspection Description - ENGR - Drainage Structures
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2024 | ENGR - Drainage Structures | Not Ready | This is for a wall inspection which will be handled by building. | |
| 01/24/2024 | ENGR - Drainage Structures | Not Ready | Spoke with Shawn explained to him that he needs to call building inspections to have screen wall rebar inspected. | |
| 03/13/2024 | ENGR - Drainage Structures | Partial Pass | Headwall Floor and toe down located on NE corner of site has all horizontal #4 rebar 12” oc and #4 vertical vertical rebar for toe down in place and is ok to pour the 30’ - 10” X 9’ area. Wing walls to be viewed toward the end of the week. |
|
| 03/19/2024 | ENGR - Drainage Structures | Partial Pass | Upper bottom of head wall on the north west corner outside of the main surrounding main walls. Partial pass left open for futuer inspections | |
| 03/21/2024 | ENGR - Drainage Structures | Not Ready | Will recall for tomorrow (Per Shawn) | |
| 03/22/2024 | ENGR - Drainage Structures | Partial Pass | Viewed outlet headwall and sidewalls all # 4 & # 6 vertical and horizontal rebar is per plan and all snap ties for plywood are in place and ready for pour on Monday the 25th. | |
| 03/27/2024 | ENGR - Drainage Structures | Partial Pass | Viewed West storm water CRP collar (3) #4 rebar 12” oc for inlet tying into existing CRP. (Okay to pour) | |
| 04/02/2024 | ENGR - Drainage Structures | Partial Pass | West CRP drainage pipe tying into existing CRP running West across Cottonwood lane viewed #4 rebar floor 12” oc and #5 vertical rebar is ready for concrete pour. | |
| 04/05/2024 | ENGR - Drainage Structures | Partial Pass | Viewed 23’ outlet headwall located in West channel of site all #4 vertical and horizontal rebar 8”oc is present and all snap ties are in place and ready for concrete pour. | |
| 05/30/2024 | ENGR - Drainage Structures | Passed | ||
| 12/19/2023 | ENGR - Drainage Structures | Partial Pass | viewed and verified 360’ of North wall footing all Horizontal #5 Trans Bars and #5 Long Bott bars are present and completed per approved plan and all #5 vertical wall reinforcement is in place and per approved plan detail. 3rd party Engineer inspection has also been completed and footer to be poured in a.m. 12/20/23 |