Permit: DP21-0361
Permit Details
Status:
Inspections
Type:
Development Package
Address:
6207 E BELLEVUE ST
Address NEW:
6207 E BELLEVUE ST
Apply Date:
12/30/2021
Applicant:
Description:
Site/Grading - Rook Bellevue Homes. Multi-family with single family units.
Permit Reviews
Permit Number - DP21-0361
Permit Status: Inspections
Permit Description: Site/Grading - Rook Bellevue Homes. Multi-family with single family units.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/11/2022 | DEV PKG | 02/28/2022 | COMPLETED |
| 07/08/2022 | DEV PKG - RESUBMITTAL | 08/31/2022 | COMPLETED |
| 12/30/2021 | DEV PKG - OK TO SUBMIT | 01/11/2022 | COMPLETED |
| 12/22/2022 | DEVELOPMENT PACKAGE REVIEW v.2 | 01/13/2023 | APPROVED |
| 11/18/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/13/2022 | REQUIRES RESUBMIT |
Conditions
Permit Number - DP21-0361
Permit Status: Inspections
Permit Description: Site/Grading - Rook Bellevue Homes. Multi-family with single family units.
| Date | Description | Comments |
|---|---|---|
| 01/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 01/06/2023 | Dust Control/Air Quality Permit is Required. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP21-0361
Permite Description: Site/Grading - Rook Bellevue Homes. Multi-family with single family units.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2023 | ENGR Grading Final | N/A | Not Ready | soil stockpiles need stormwater protection (second notice) |
| 06/26/2024 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | No concerns at this time stormwater |
| 07/24/2024 | PDSD Site/Engineering Division - NPPO | N/A | Partial Pass | Contractor called in the wrong inspection contractor get the footers and the rebar layout for the trash enclosure |
| 08/01/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | I met with a contractor on the site to take a look and see what is happening at this time. The trash enclosure footers have been poured, and the bollards have been set in place place. the contractor will be working on constructing the walls for the trash enclosure. I have advised the contractor that when they are constructing the walls, they have to stop at 4 foot and grout all cells prior to going any higher above the 4 foot level. He will take pictures of the wall once they have it to 4 foot will have the grout placed and will take pictures of the grout prior to installing the additional 2 foot on top of the lower wall. Once he is done with the upper wall, then they will grout that and ensuring that a bond beam is at the top of the wall and will provide photos of the completed work. There have been questions asked about the permits for the houses that are requiring a special inspection for grade. I have advised him to contact Joshua Garcia or Stephen blood to make a determination if a special inspection is required. for any of the work as noted on the Approved plans. I also have advised him to talk to Joshua Garcia about what Permits will be required for the the retaining walls and screen walls shown on his building plans. |
| 08/15/2024 | ENGR - Drainage Structures | N/A | Partial Pass | Contractor warming up the apron and the floor for the trash enclosure and set the steel per plan. Everything looks good. Good to poor. |