Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - DP21-0361
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | ENGR - Drainage Structures | Partial Pass | Contractor, good to pour the footing on the north west side of the project | |
| 05/22/2025 | ENGR - Drainage Structures | Partial Pass | Contract is good to pour 96 lineal feet of retaining wall on the west side off of rook | |
| 06/11/2025 | ENGR - Drainage Structures | Partial Pass | Contractor, good to grout the walls on rock the north west side and the southwest side | |
| 07/23/2024 | ENGR - Drainage Structures | Not Ready | Call call the contractor nobody answered and there’s nobody on site. Contractor will have to call in for a reinspection. | |
| 08/01/2024 | ENGR - Drainage Structures | Partial Pass | met with a contractor on site to look at the trash enclosure to see what work has been completed and what still needs to be done. Contractor informed me that Martin Hernandez has approved the footer for this project and it appears to be within plan specifications. They are asking to be able to start building the block walls and will be doing that later on today. I have them given them the approval for starting on the walls. As long as they do not go above 4 feet. At 4 feet high on the wall they will need to grout all of the sales or provide knockout openings in each block that contains rebar and show me the photos that those have been done. The contractor contacted me and said that they had completed the wall of divorce foot and it is now 4 PM in the afternoon. They will try to go out either tomorrow or sometime the first part of next week depending on how the weather holds up. |
|
| 08/05/2024 | ENGR - Drainage Structures | Partial Pass | The contractor is preparing to pour the grout for the first left of the trash enclosure located at the south east corner of this project. Photographs will be provided from the contractor once the grout has been placed and approved before they can continue with laying additional rows of block | |
| 08/07/2024 | ENGR - Drainage Structures | Partial Pass | ||
| 08/15/2024 | ENGR - Drainage Structures | Partial Pass | Contractor warming up the apron and the floor for the trash enclosure and set the steel per plan. Everything looks good. Good to poor. | |
| 09/26/2023 | ENGR - Drainage Structures | Not Ready | site fenced, no activity for several weeks/months. |