Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: ENGR Grading Final
Permit Number - DP21-0361
Inspection Description - ENGR Grading Final
Inspection Status - Complete (Recurring)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2023 | ENGR Grading Final | Complete (Recurring) | Josh at 520-409-6705 | |
| 04/01/2024 | ENGR Grading Final | Partial Pass | trenching for utilities | |
| 05/01/2023 | ENGR Grading Final | Complete (Recurring) | Cutting in for house pads right now. Informed the contractor to call in every two weeks for inspection | |
| 06/01/2023 | ENGR Grading Final | Complete (Recurring) | site has been Roth graded. Temporary fencing in place. No activity at this time | |
| 06/26/2024 | ENGR Grading Final | Not Ready | Contractor is going to reschedule | |
| 07/26/2023 | ENGR Grading Final | Partial Pass | rough grading | |
| 08/31/2023 | ENGR Grading Final | Not Ready | no erosion control around soil stockpile | |
| 11/13/2023 | ENGR Grading Final | Not Ready | soil stockpiles need stormwater protection (second notice) |