Permit: DP21-0324
Permit Details
Apply Date:
11/29/2021
Applicant:
German Hermosillo
Description:
Revision 2 - started 10.24.2025 - update to parking spaces ** Revision 1 - Site/Grading - New apartment bldg
Permit Reviews
Permit Number - DP21-0324
Permit Status: Complete
Permit Description: Revision 2 - started 10.24.2025 - update to parking spaces ** Revision 1 - Site/Grading - New apartment bldg
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/29/2021 | DEV PKG - OK TO SUBMIT | 12/06/2021 | COMPLETED |
| 12/06/2021 | DEV PKG | 01/10/2022 | COMPLETED |
| 12/05/2023 | DEVELOPMENT PACKAGE NEW v.2 | 01/03/2024 | APPROVED |
| 09/29/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/06/2023 | REQUIRES RESUBMIT |
| 10/24/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/26/2025 | REQUIRES RESUBMIT |
| 08/08/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 08/25/2023 | REQUIRES RESUBMIT |
| 06/05/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 07/09/2025 | APPROVED |
| 02/19/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/19/2026 | APPROVED |
| 06/05/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 06/05/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0324
Permite Description: Revision 2 - started 10.24.2025 - update to parking spaces ** Revision 1 - Site/Grading - New apartment bldg
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | N/A | Re-inspection required | Cross slope at “driveway” exceeds 2.5%. | |
| 04/27/2026 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0324
Permit Description: Revision 2 - started 10.24.2025 - update to parking spaces ** Revision 1 - Site/Grading - New apartment bldg
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Site engineering met with contractor and engineer of record yesterday. Elevations, vertical separation and scupper issues at sidewalks have been addressed. These will be redlined and okayed by engineering and all changes will be submitted as As-Builts before close out. Contaractor and I went over changes. Okay to proceed. | |
| 04/27/2026 | SITE - Zoning Final | Passed |