Inspection History Details
Inspection Status: Re-inspection required
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | PDSD Engineering Division Pre-Construction SITE | Re-inspection required | 3/25/26 Contractor needs current approved Development Package plan set stamped 2/19/2026. Reschedule inspection when ready. |
|
| 04/07/2026 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Elevations on plan are such that it cannot be built per plan and drain correctly. Also the sidewalk scuppers at grade are not correct. The inverts should be at grade. Any field changes approved by site engineering will be required initialed red-lines and an As-Built submission at the end of construction. | |
| 04/14/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Site engineering met with contractor and engineer of record yesterday. Elevations, vertical separation and scupper issues at sidewalks have been addressed. These will be redlined and okayed by engineering and all changes will be submitted as As-Builts before close out. Contaractor and I went over changes. Okay to proceed. |