Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP21-0246
Permit Details
Apply Date:
09/14/2021
Applicant:
Description:
Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Permit Reviews
Permit Number - DP21-0246
Permit Status: Issued
Permit Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/05/2022 | DEV PKG - RESUBMITTAL | 04/01/2022 | COMPLETED |
07/06/2022 | DEV PKG - OK TO SUBMIT | 07/19/2022 | COMPLETED |
07/19/2022 | DEV PKG - REVISION | 09/02/2022 | COMPLETED |
09/14/2021 | DEV PKG - OK TO SUBMIT | 09/27/2021 | COMPLETED |
09/27/2021 | DEV PKG | 12/09/2021 | COMPLETED |
04/05/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/10/2023 | APPROVED |
Conditions
Permit Number - DP21-0246
Permit Status: Issued
Permit Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Date | Description | Comments |
---|---|---|
09/12/2022 | Revised drawings required for change to roof drains before final inspection |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP21-0246
Permite Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/07/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | |
04/07/2023 | ENGR Grading Final | N/A | Partial Pass | Contractor to provide handrail |
Completed Inspections
Permit Status: Issued
Permit Number: DP21-0246
Permit Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2023 | SITE - Stormwater Follow-up | Passed | contractor is looking for T .C O Im good with it . contractor need to install the handrail and the address the slope at the southwest end of the project by the trash enclosure. |
|
07/12/2023 | SITE - Stormwater Final Inspection | Passed | ||
07/12/2023 | SITE - Stormwater Setup and Controls | Passed | ||
12/11/2023 | ENGR Engineering Final | Passed | ||
01/10/2024 | ENGR Grading Final | Passed |