Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
| 03/06/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Contractor need to put waddles along the south end of the building along the fence line | |
| 03/13/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Good no concerns at this time | |
| 04/07/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 07/11/2023 | SITE - Stormwater Follow-up | Partial Pass | The slope walking towards the trash enclosure is non-compliant. Contractor needs the engineering of records to sign off on the trash enclosure . It was not inspected by the City Of Tucson. The entrance from the sidewalk going towards the building, exceeds 5% notify the contractor that they need some railing installed. | |
| 07/12/2023 | SITE - Stormwater Follow-up | Passed | contractor is looking for T .C O Im good with it . contractor need to install the handrail and the address the slope at the southwest end of the project by the trash enclosure. |