Permit Details

Status:
Issued
Type:
Development Package
Address:
3434 S KINO PW
Apply Date:
08/17/2021
Applicant:
Lisa Bowers
Description:
*Revision #3 (plumbing) started 6/21/2024* Site/Grading/Swppp - The Bridges Sub-Area B-3, Lots 6,8, and 9.

Permit Reviews

Permit Number - DP21-0213
Permit Status: Issued
Permit Description: *Revision #3 (plumbing) started 6/21/2024* Site/Grading/Swppp - The Bridges Sub-Area B-3, Lots 6,8, and 9.
Start Date Submittal Complete Date Status  
03/04/2022 DEV PKG - RESUBMITTAL 03/16/2022 COMPLETED Review Details
05/09/2022 DEV PKG - OK TO SUBMIT 06/13/2022 COMPLETED Review Details
06/13/2022 REVISION - - 1ST 07/12/2022 COMPLETED Review Details
08/19/2021 DEV PKG - OK TO SUBMIT 08/27/2021 COMPLETED Review Details
08/27/2021 DEV PKG 10/04/2021 COMPLETED Review Details
10/04/2022 DEV PKG - OK TO SUBMIT 10/11/2022 ACTIVE Review Details
12/30/2021 DEV PKG - RESUBMITTAL 03/03/2022 COMPLETED Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/02/2022 REQUIRES RESUBMIT Review Details
06/21/2024 DEVELOPMENT PACKAGE NEW v.1 06/27/2024 APPROVED Review Details
11/29/2022 DEVELOPMENT PACKAGE REVIEW v.2 12/15/2022 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP21-0213
Permite Description: *Revision #3 (plumbing) started 6/21/2024* Site/Grading/Swppp - The Bridges Sub-Area B-3, Lots 6,8, and 9.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/16/2023 TRSP - ROW - Final/Close-Out N/A Not Applicable n/a per Dave Roberts
03/02/2023 ENGR Grading Final N/A Not Ready COMPLETE ALL THE WORK THAT IS SHOWN ON THE APPROVED PLANS. PROVIDE REVISED DRAWINGS AS NEEDED FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITES APPROVED SET OF DRAWINGS. THIS WILL INCLUDE BUT IS NOT LIMITED TO ALL LANDSCAPE ITEMS THAT EITHER ARE NOT COMPLETE OR INSTALLED CORRECTLY, OR STILL NEED TO BE INSTALLED, (WATER HARVESTING BASINS TOO SHALLOW, ADDED ROCK RIP RAP ON THE EAST AND NORTH SIDES OF THE SITE, MISSING PLANTERS IN THE SIDEWALK AREAS). COMPLETE ALL OF THE WORK FOR LOTS 8 AND 9 AS NOTED ON THE APPROVED PLANS. ENSURE THAT THIS REVISION WILL ALSO INCLUDE THE REMOVAL OF ANY AND ALL WORK FOR LOT #6 THAT WILL NOT BE COMPLETED PER THESE APPROVED PLANS.

ADDITIONAL INSPECTIONS FOR THIS SITE WILL BE REQUIRED BEFORE IT IS POSSIBLE FOR APPLYING FOR A TCO FOR EITHER LOT #8 AND #9.
02/16/2023 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns as of today
03/02/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready COMPLETE ALL THE WORK THAT IS SHOWN ON THE APPROVED PLANS. PROVIDE REVISED DRAWINGS AS NEEDED FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITES APPROVED SET OF DRAWINGS. THIS WILL INCLUDE BUT IS NOT LIMITED TO ALL LANDSCAPE ITEMS THAT EITHER ARE NOT COMPLETE OR INSTALLED CORRECTLY, OR STILL NEED TO BE INSTALLED, (WATER HARVESTING BASINS TOO SHALLOW, ADDED ROCK RIP RAP ON THE EAST AND NORTH SIDES OF THE SITE, MISSING PLANTERS IN THE SIDEWALK AREAS). COMPLETE ALL OF THE WORK FOR LOTS 8 AND 9 AS NOTED ON THE APPROVED PLANS. ENSURE THAT THIS REVISION WILL ALSO INCLUDE THE REMOVAL OF ANY AND ALL WORK FOR LOT #6 THAT WILL NOT BE COMPLETED PER THESE APPROVED PLANS.

ADDITIONAL INSPECTIONS FOR THIS SITE WILL BE REQUIRED BEFORE IT IS POSSIBLE FOR APPLYING FOR A TCO FOR EITHER LOT #8 AND #9.

Completed Inspections

Permit Status: Issued
Permit Number: DP21-0213
Permit Description: *Revision #3 (plumbing) started 6/21/2024* Site/Grading/Swppp - The Bridges Sub-Area B-3, Lots 6,8, and 9.
Total Completed Inspections - 17
Date Description Inspector Results Comments
03/02/2023 SITE - SWPPP Violation Notice Passed N/A
03/02/2023 SITE - SWPPP Correction Notice Passed N/A
03/02/2023 SITE - Stormwater Setup and Controls Passed N/A
03/02/2023 PDSD Engineering Division Pre-Construction SITE Passed N/A
03/02/2023 COT - ENGR - Signage Final Passed N/A
03/02/2023 PDSD Site/Engineering Division - NPPO Passed NA/
03/02/2023 ENGR - Drainage Structures Passed N/A
03/02/2023 COT - SITE - Zoning Intermediate Passed N/A
03/02/2023 COT - FCON - Fire - Final Passed
03/02/2023 SITE - Zoning Final Passed N/A
03/09/2023 COT - ENGR - Stormwater Passed
03/09/2023 Final inspection to ensure all landscape and water harvesting SITE Passed
03/09/2023 ENGR Grading Final Passed
03/15/2023 SITE - Stormwater Follow-up Passed
03/15/2023 PDSD Site/Engineering Division - Landscaping Passed
03/15/2023 SITE - Stormwater Final Inspection Passed
04/12/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPROVED REV3_1_PLAN SET - THE BRIDGES B-III LOTS 6, 8 AND 9 - NE SHOPS - DP-REV3 - 2024-06-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW