Permit: DP21-0184
Permit Details
Apply Date:
07/12/2021
Applicant:
Description:
Revision 2 - Trash enclosures, started 01.21.2026 ** Tentative Plat - Placita Escondita, new clubhouse (revision to S04-178).
Permit Reviews
Permit Number - DP21-0184
Permit Status: Fees paid
Permit Description: Revision 2 - Trash enclosures, started 01.21.2026 ** Tentative Plat - Placita Escondita, new clubhouse (revision to S04-178).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/12/2021 | DEV PKG - OK TO SUBMIT | 07/15/2021 | COMPLETED |
| 07/15/2021 | TENTATIVE PLAT REVIEW | 09/06/2021 | COMPLETED |
| 09/14/2021 | TENTATIVE PLAT REVIEW | 10/07/2021 | COMPLETED |
| 01/21/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/18/2026 | APPROVED |
| 12/23/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/30/2022 | APPROVED |
| 12/15/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/16/2022 | APPROVED |
Outstanding Inspections
Permit Status: Fees Paid
Permit Number: DP21-0184
Permite Description: Revision 2 - Trash enclosures, started 01.21.2026 ** Tentative Plat - Placita Escondita, new clubhouse (revision to S04-178).
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 06/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No contact information provided. Caldwell construction. New building at rear of complex. Landmark engineering. Area enclosed with temporary fencing. Material piles on site. } |
| 07/19/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 07/19/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Site perimeter block wall used to contain sites southern perimeter.} |
| 09/01/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 09/01/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 06/17/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} |
| 04/11/2023 | SITE - SWPPP Correction Notice | N/A | Not Applicable | |
| 04/11/2023 | SITE - SWPPP Violation Notice | N/A | Not Applicable | |
| 08/04/2023 | SITE - Stormwater Final Inspection | N/A | Partial Pass | |
| 08/04/2023 | ENGR Grading Final | N/A | Partial Pass | |
| 04/18/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Dale With Caldwell construction request an afternoon, Grading inspection. |
| 07/03/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | This permit covers the entire site, inspected today, 4/3/24 is address 2032. once the other 6 buildings are completed then the DP can be looked at to close out. |
| 07/03/2024 | COT - ENGR - Signage Final | N/A | Not Ready | This permit covers the entire site, inspected today, 4/3/24 is address 2032. once the other 6 buildings are completed then the DP can be looked at to close out. |
| 07/31/2025 | Consultation SITE | N/A | Not Ready | We need to figure out where to start and end. 1) sidewalks are being replaced 2) landscaping needs to be finished. 3) stairs and rails need to be painted. 4) ADA signs need to be installed 5) carport needs to be completed 6) all fencing and construction materials and Conex boxes will need to be removed. |
| 08/16/2024 | ENGR Engineering Final | N/A | Not Ready | This site isn’t being constructed at this time currently working on the residences themselves not the clubhouse |