Inspection History Details
Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | Consultation SITE | Partial Pass | Contractor wanted to know the process for building a Refuse Enclosure and when inspections should scheduled. Recap: Schedule inspection for wall footer to check reinforcing. Schedule pre-grout inspection when wall is at 4 feet. (1st lift) Schedule pre-grout inspection is built to top. (2nd lift) Schedule inspection for Ballard footers for correct spacing Schedule inspection for floor reinforcing mat- apron can be scheduled at the same time and the Bollard inspection as well. Final Inspection is when gates are complete, with holes for cane bolts and Enclosure is finished. To check functionality. |
|
| 06/09/2026 | Consultation SITE | Partial Pass | Okay to pour slab after expansion is installed. Call in for grouting. | |
| 06/12/2026 | Consultation SITE | Passed | 6/12/26 - Site visit to observe refuse enclosure wall grout in single lift. Reinforcement is correct. Grout is a good consistency to flow and cells are being vibrated. | |
| 07/31/2025 | Consultation SITE | Not Ready | We need to figure out where to start and end. 1) sidewalks are being replaced 2) landscaping needs to be finished. 3) stairs and rails need to be painted. 4) ADA signs need to be installed 5) carport needs to be completed 6) all fencing and construction materials and Conex boxes will need to be removed. |