Permit: DP21-0094
Permit Details
Apply Date:
04/13/2021
Applicant:
Description:
Site/Grading - Circle K at The Bridges, Sub-Area B-3. Fuel canopy, roadway, median.
Permit Reviews
Permit Number - DP21-0094
Permit Status: Complete
Permit Description: Site/Grading - Circle K at The Bridges, Sub-Area B-3. Fuel canopy, roadway, median.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/13/2021 | DEV PKG - OK TO SUBMIT | 04/15/2021 | COMPLETED |
04/15/2021 | DEV PKG | 06/04/2021 | COMPLETED |
08/04/2021 | DEV PKG - RESUBMITTAL | 09/09/2021 | COMPLETED |
11/23/2021 | DEV PKG - RESUBMITTAL | 01/03/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0094
Permite Description: Site/Grading - Circle K at The Bridges, Sub-Area B-3. Fuel canopy, roadway, median.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/10/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 09/27/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 08/26/2022; Status: Continued; Inspector: BBENEDDON; Comment: Entered by NGARCIA3 - Continued. Minor track out noted.} |
09/27/2022 | ENGR Grading Final | N/A | Scheduled | {Activity date: 09/27/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED, LOOKED AT APPROXIMATELY 20 FEET OF 12 INCH DRAINAGE PIPE WEST OF THE FUEL ISLAND SOUTH TOWARDS THE BUILDING} ; {Activity date: 08/26/2022; Status: Partial Approval; Inspector: BBENEDDON; Comment: Entered by NGARCIA3 - Partially approved. 18 inch HDPE as shown. Paul with Circle K at 480-430-1759. Post SWPPP information with address. Schedule Stormwater inspections biweekly. Schedule 09185, Grading intermediate inspections as needed for all work shown on civil drawings. Schedule 09152 Stormwater controls inspection. Provide contact information on scheduling inspections. } |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0094
Permit Description: Site/Grading - Circle K at The Bridges, Sub-Area B-3. Fuel canopy, roadway, median.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/26/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: BBENEDDON; Comment: Entered by NGARCIA3 - Approved. Paul with Circle K at 480-430-1759. Post SWPPP information with address. Schedule Stormwater inspections biweekly. Schedule 09185, Grading intermediate inspections as needed for all work shown on civil drawings. Schedule 09152 Stormwater controls inspection. Provide contact information on scheduling inspections. Days excavating on site. } ; {Activity date: 08/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN./ INFORMED THE CONTRACTOR THAT THERE IS THREE NUMBER 4 BARS AT THE CORNER AND TWO NUMBER 4 BARS AT ENDSOR FRONT. ALSO TO CALL IN FOR INSPECTION EVERY TWO. } |
|
03/09/2023 | ENGR Engineering Final | Passed | N/A |
Scheduled Inspections
Scheduled Inspections - DP21-0094
Status: Complete
Description: Site/Grading - Circle K at The Bridges, Sub-Area B-3. Fuel canopy, roadway, median.
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
01/10/2023 | ENGR Grading Final | Scheduled |