Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Scheduled
Inspection History: ENGR Grading Final
Permit Number - DP21-0094
Inspection Description - ENGR Grading Final
Inspection Status - Scheduled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by VVERA1 - IS CONTINUED, LOOKED AT APPROXIMATELY 20 FEET OF 12 INCH DRAINAGE PIPE WEST OF THE FUEL ISLAND SOUTH TOWARDS THE BUILDING |
08/26/2022 | ENGR Grading Final | BBENEDDON | Partial Approval | Entered by NGARCIA3 - Partially approved. 18 inch HDPE as shown. Paul with Circle K at 480-430-1759. Post SWPPP information with address. Schedule Stormwater inspections biweekly. Schedule 09185, Grading intermediate inspections as needed for all work shown on civil drawings. Schedule 09152 Stormwater controls inspection. Provide contact information on scheduling inspections. |