Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDDON |
Approved |
Entered by NGARCIA3 - Approved. Paul with Circle K at 480-430-1759. Post SWPPP information with address. Schedule Stormwater inspections biweekly. Schedule 09185, Grading intermediate inspections as needed for all work shown on civil drawings. Schedule 09152 Stormwater controls inspection. Provide contact information on scheduling inspections. Days excavating on site.
|
| 08/10/2022 |
PDSD Engineering Division Pre-Construction SITE |
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN./ INFORMED THE CONTRACTOR THAT THERE IS THREE NUMBER 4 BARS AT THE CORNER AND TWO NUMBER 4 BARS AT ENDSOR FRONT.
ALSO TO CALL IN FOR INSPECTION EVERY TWO.
|