Permit: DP21-0014
Permit Details
Apply Date:
01/15/2021
Applicant:
Corey Thompson
Description:
Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Permit Reviews
Permit Number - DP21-0014
Permit Status: Fees paid
Permit Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/15/2021 | DEV PKG - OK TO SUBMIT | 01/22/2021 | COMPLETED |
01/22/2021 | TENTATIVE PLAT REVIEW | 03/10/2021 | COMPLETED |
03/22/2021 | TENTATIVE PLAT REVIEW | 04/21/2021 | COMPLETED |
04/29/2021 | TENTATIVE PLAT REVIEW | 04/30/2021 | COMPLETED |
07/13/2021 | DEV PKG - OK TO SUBMIT | 07/15/2021 | COMPLETED |
07/15/2021 | REVISION - - 1ST | 07/28/2021 | COMPLETED |
07/18/2022 | DEV PKG - OK TO SUBMIT | 08/24/2022 | COMPLETED |
08/24/2022 | REVISION - - 3RD | 10/10/2022 | COMPLETED |
09/16/2021 | DEV PKG - OK TO SUBMIT | 10/11/2021 | COMPLETED |
10/11/2021 | REVISION - - 2ND | 11/05/2021 | COMPLETED |
12/03/2021 | REVISION - - 2ND | 01/05/2022 | COMPLETED |
08/21/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP21-0014
Permit Status: Fees paid
Permit Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/28/2023 | Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's) |
Outstanding Inspections
Permit Status: Fees Paid
Permit Number: DP21-0014
Permite Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2021 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 09/21/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - THE PRE-CON INSPECTION HAS BEEN HELD ON THIS SITE TODAY. I MET WITH THE DEVELOPERS REPRESENTATIVES, KB HOMES, RICK ENGINEERING, AND BRIAN FROM DESERT EARTH AND DISCUSSED WHAT WILL BE NEEDED DURING THE DURATION OF THIE PROJECT. THEY ARE PLANNING ON START THE INSTALLATION OF THE STORMWATER CONTROLS NEXT WEEK IF POSSIBLE, AND CLEARING AND GRUBBING ONCE THEY ARE READY IN OCTOBER. } ; {Activity date: 09/20/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY,TO BE RESCHEDULED FOR 8:00 TOMORROW MORNING. CONTACTED BRIAN WITH DESERT EARTH FOR THIS ON-SITE INSPECTION IT WILL BE RESCHEDULED FOR TOMORROW} ; {Activity date: 09/20/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} |
11/10/2021 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 11/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /GOOD FOR TODAY .} |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
04/17/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Everything’s good at this time no concerns thank you |
03/06/2023 | ENGR Engineering Final | N/A | Partial Pass | |
12/19/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | LOOKED AT THE LANDSCAPING FOR THE FOLLOWING COMMON AREAS; “B-1”, “B-2”, “B-3”, “A-2”, “D-1” WHICH APPEAR TO BE COMPLETE AT THIS TIME FOR A FULL RELEASE FROM THE ASSURANCES. |