Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
8903 E LINDERBROOK DR
Apply Date:
01/15/2021
Applicant:
Description:
Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1

Permit Reviews

Permit Number - DP21-0014
Permit Status: Issued
Permit Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Start Date Submittal Complete Date Status  
01/15/2021 DEV PKG - OK TO SUBMIT 01/22/2021 COMPLETED Review Details
01/22/2021 TENTATIVE PLAT REVIEW 03/10/2021 COMPLETED Review Details
03/22/2021 TENTATIVE PLAT REVIEW 04/21/2021 COMPLETED Review Details
04/29/2021 TENTATIVE PLAT REVIEW 04/30/2021 COMPLETED Review Details
07/13/2021 DEV PKG - OK TO SUBMIT 07/15/2021 COMPLETED Review Details
07/15/2021 REVISION - - 1ST 07/28/2021 COMPLETED Review Details
07/18/2022 DEV PKG - OK TO SUBMIT 08/24/2022 COMPLETED Review Details
08/24/2022 REVISION - - 3RD 10/10/2022 COMPLETED Review Details
09/16/2021 DEV PKG - OK TO SUBMIT 10/11/2021 COMPLETED Review Details
10/11/2021 REVISION - - 2ND 11/05/2021 COMPLETED Review Details
12/03/2021 REVISION - - 2ND 01/05/2022 COMPLETED Review Details
08/21/2023 DEVELOPMENT PACKAGE NEW v.1 02/24/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP21-0014
Permite Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
09/21/2021 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) {Activity date: 09/21/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - THE PRE-CON INSPECTION HAS BEEN HELD ON THIS SITE TODAY. I MET WITH THE DEVELOPERS REPRESENTATIVES, KB HOMES, RICK ENGINEERING, AND BRIAN FROM DESERT EARTH AND DISCUSSED WHAT WILL BE NEEDED DURING THE DURATION OF THIE PROJECT. THEY ARE PLANNING ON START THE INSTALLATION OF THE STORMWATER CONTROLS NEXT WEEK IF POSSIBLE, AND CLEARING AND GRUBBING ONCE THEY ARE READY IN OCTOBER.

} ; {Activity date: 09/20/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY,TO BE RESCHEDULED FOR 8:00 TOMORROW MORNING. CONTACTED BRIAN WITH DESERT EARTH FOR THIS ON-SITE INSPECTION IT WILL BE RESCHEDULED FOR TOMORROW} ; {Activity date: 09/20/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
11/10/2021 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 11/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /GOOD FOR TODAY .}
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
04/17/2023 SITE - Stormwater Follow-up N/A Complete (Recurring) Everything’s good at this time no concerns thank you
03/06/2023 ENGR Engineering Final N/A Partial Pass
12/19/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass LOOKED AT THE LANDSCAPING FOR THE FOLLOWING COMMON AREAS; “B-1”, “B-2”, “B-3”, “A-2”, “D-1” WHICH APPEAR TO BE COMPLETE AT THIS TIME FOR A FULL RELEASE FROM THE ASSURANCES.
11/17/2025 Consultation SITE N/A Partial Pass 11/17/25
Regarding repairs and additional Erosion protection on slopes on a number of items outlined in email with KB and civil contractor. Meeting today was to plan for reasonable solutions to mitigate/fix the items. I will follow up with email of what was discussed.

Completed Inspections

Permit Status: Issued
Permit Number: DP21-0014
Permit Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/23/2025 PDSD Site/Engineering Division - Landscaping Passed
10/23/2025 SITE - Stormwater Final Inspection Passed

Scheduled Inspections

Scheduled Inspections - DP21-0014
Status: Issued
Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Scheduled Date Description Entered By Entered Date
10/24/2025 ENGR Engineering Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV 3_1_BT2_DEVELOPMENT PACKAGE REV 3__V1.PDF DOCUMENTS VIEW