Permit: DP21-0014
Permit Details
Status:
Issued
Type:
Development Package
Address:
8903 E LINDERBROOK DR
Address NEW:
8903 E LINDERBROOK DR
Apply Date:
01/15/2021
Applicant:
Description:
Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Permit Reviews
Permit Number - DP21-0014
Permit Status: Issued
Permit Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2021 | DEV PKG - OK TO SUBMIT | 01/22/2021 | COMPLETED |
| 01/22/2021 | TENTATIVE PLAT REVIEW | 03/10/2021 | COMPLETED |
| 03/22/2021 | TENTATIVE PLAT REVIEW | 04/21/2021 | COMPLETED |
| 04/29/2021 | TENTATIVE PLAT REVIEW | 04/30/2021 | COMPLETED |
| 07/13/2021 | DEV PKG - OK TO SUBMIT | 07/15/2021 | COMPLETED |
| 07/15/2021 | REVISION - - 1ST | 07/28/2021 | COMPLETED |
| 07/18/2022 | DEV PKG - OK TO SUBMIT | 08/24/2022 | COMPLETED |
| 08/24/2022 | REVISION - - 3RD | 10/10/2022 | COMPLETED |
| 09/16/2021 | DEV PKG - OK TO SUBMIT | 10/11/2021 | COMPLETED |
| 10/11/2021 | REVISION - - 2ND | 11/05/2021 | COMPLETED |
| 12/03/2021 | REVISION - - 2ND | 01/05/2022 | COMPLETED |
| 08/21/2023 | DEVELOPMENT PACKAGE NEW v.1 | 02/24/2025 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP21-0014
Permite Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2021 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 09/21/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - THE PRE-CON INSPECTION HAS BEEN HELD ON THIS SITE TODAY. I MET WITH THE DEVELOPERS REPRESENTATIVES, KB HOMES, RICK ENGINEERING, AND BRIAN FROM DESERT EARTH AND DISCUSSED WHAT WILL BE NEEDED DURING THE DURATION OF THIE PROJECT. THEY ARE PLANNING ON START THE INSTALLATION OF THE STORMWATER CONTROLS NEXT WEEK IF POSSIBLE, AND CLEARING AND GRUBBING ONCE THEY ARE READY IN OCTOBER. } ; {Activity date: 09/20/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY,TO BE RESCHEDULED FOR 8:00 TOMORROW MORNING. CONTACTED BRIAN WITH DESERT EARTH FOR THIS ON-SITE INSPECTION IT WILL BE RESCHEDULED FOR TOMORROW} ; {Activity date: 09/20/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} |
| 11/10/2021 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 11/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /GOOD FOR TODAY .} |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 04/17/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Everything’s good at this time no concerns thank you |
| 03/06/2023 | ENGR Engineering Final | N/A | Partial Pass | |
| 12/19/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | LOOKED AT THE LANDSCAPING FOR THE FOLLOWING COMMON AREAS; “B-1”, “B-2”, “B-3”, “A-2”, “D-1” WHICH APPEAR TO BE COMPLETE AT THIS TIME FOR A FULL RELEASE FROM THE ASSURANCES. |
| 11/17/2025 | Consultation SITE | N/A | Partial Pass | 11/17/25 Regarding repairs and additional Erosion protection on slopes on a number of items outlined in email with KB and civil contractor. Meeting today was to plan for reasonable solutions to mitigate/fix the items. I will follow up with email of what was discussed. |
Completed Inspections
Permit Status: Issued
Permit Number: DP21-0014
Permit Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2025 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 10/23/2025 | SITE - Stormwater Final Inspection | Passed |
Scheduled Inspections
Scheduled Inspections - DP21-0014
Status: Issued
Description: Tentative Plat - Bella Tierra, Phase 2. An FLD subdivision. Lots 1 through 105, and common areas A-1
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 10/24/2025 | ENGR Engineering Final | Scheduled |