Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/14/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - NOT READY AT THIS TIME, COMPLETE ALL WORK ON THIS SITE TO THE POINT THAT LESS THAN ONE ACRE IS OPEN, EXPOSED, OR UNDEVELOPED. |
| 03/06/2023 | ENGR Engineering Final | Partial Pass | ||
| 03/09/2026 | ENGR Engineering Final | Passed | ||
| 04/03/2025 | ENGR Engineering Final | Not Ready | The Slope behind Lot 27 needs hand placed riprap and geotex fabric underneath per plan. Slope is 2:1 and as such requires it. Also Another section of slope just to the east of this area on the other side of the channel is eroding and needs erosion control. It Also should have the hand placed riprap and geotex fabric underneath. This same channel is collecting sediment in sections and the sediment needs to be removed. |
|
| 10/23/2025 | ENGR Engineering Final | Canceled | ||
| ENGR Engineering Final | Scheduled | |||
| 11/03/2023 | ENGR Engineering Final | Not Ready | Map question takes you to the town of Catalina ? |