Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP21-0014

Parcel: 136301380

Inspection Status: Complete (Recurring)

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP21-0014

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
09/21/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Continued Entered by RSALDAT1 - THE PRE-CON INSPECTION HAS BEEN HELD ON THIS SITE TODAY. I MET WITH THE DEVELOPERS REPRESENTATIVES, KB HOMES, RICK ENGINEERING, AND BRIAN FROM DESERT EARTH AND DISCUSSED WHAT WILL BE NEEDED DURING THE DURATION OF THIE PROJECT. THEY ARE PLANNING ON START THE INSTALLATION OF THE STORMWATER CONTROLS NEXT WEEK IF POSSIBLE, AND CLEARING AND GRUBBING ONCE THEY ARE READY IN OCTOBER.
09/20/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Not ready for Inspection Entered by RSALDAT1 - NOT READY,TO BE RESCHEDULED FOR 8:00 TOMORROW MORNING. CONTACTED BRIAN WITH DESERT EARTH FOR THIS ON-SITE INSPECTION IT WILL BE RESCHEDULED FOR TOMORROW
09/20/2021 PDSD Engineering Division Pre-Construction SITE IVR USER Cancelled Entered by IVR USER - IVRS - RI canceled