Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0228
Permit Details
Apply Date:
11/09/2020
Applicant:
Kyle Shepherd
Description:
Grading/Swppp - La Estancia, Phase 2 East, Parcel 4, Lots 1-93 and Common Areas A-4 and B-4.
Permit Reviews
Permit Number - DP20-0228
Permit Status: Issued
Permit Description: Grading/Swppp - La Estancia, Phase 2 East, Parcel 4, Lots 1-93 and Common Areas A-4 and B-4.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/14/2021 | GRADING | 01/26/2021 | COMPLETED |
11/09/2020 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 11/19/2020 | COMPLETED |
11/13/2020 | GRADING | 01/05/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP20-0228
Permit Status: Issued
Permit Description: Grading/Swppp - La Estancia, Phase 2 East, Parcel 4, Lots 1-93 and Common Areas A-4 and B-4.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0228
Permite Description: Grading/Swppp - La Estancia, Phase 2 East, Parcel 4, Lots 1-93 and Common Areas A-4 and B-4.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | Ensure that all work is completed per the approved plans, and provide this department with the NOT Notice of Termination from the Arizona Department of Environment Quality for this Permit. What’s this information has been pre-AA inspection for this can be done and this portion of the permit can be approved. |
05/10/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | This site has been inspected for the Stormwater and there are no concerns at this time. This site will be re-inspected next week to verify how close it is to being completed. |
04/25/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Partial inspection, I need to complete the landscaping per plan. Replace all dead plants and remove debris from basins. |
10/27/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Provide the landscape plans that will be utilized for this site and all the other sites so that this work can be inspected and approved |
01/20/2023 | ENGR Grading Final | N/A | Partial Pass | N/A |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0228
Permit Description: Grading/Swppp - La Estancia, Phase 2 East, Parcel 4, Lots 1-93 and Common Areas A-4 and B-4.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } | |
01/20/2023 | COT - ENGR - Signage Final | Passed | N/A | |
02/06/2023 | SITE - Stormwater Setup and Controls | Passed | No concerns at this time | |
10/30/2023 | ENGR Engineering Final | Passed |