Permit: DP20-0228

Parcel: 141366880

Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP20-0228

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
10/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME
09/30/2022 SITE - Stormwater Follow-up DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL, NO CONCERNS AT THIS TIME DURING THIS INSPECTION.
08/05/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME
07/22/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME
06/24/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by VVERA1 - Continued
06/13/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN / NO CONCERNS AS OF TODAY.
05/27/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME, MINOR CLEANUP OF CAMINO BOLEADORAS IS NEEDED ON THE EASTERN HALF BETWEEN WILMOT ROAD AND KOLB ROAD
05/13/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME.
04/01/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME
03/18/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME. THIS SITE WILL BE SCHEDULED IN THE FUTURE FOR LANDSCAPING AND THE FINAL GRADING INSPECTIONS.
02/18/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - S CONTINUED AT THIS TIME, NO CONCERNS
02/04/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME.
12/10/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME. MINOR TRACK OUT NOTED IN THE LOCAL STREETS AFTER LAST NIGHTS RAIN.
11/15/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN LOOKS GOOD TODAY NOT READY FOR LANDSCAPE INSPECTION YET
10/29/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME.
10/15/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued
10/01/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - S CONTINUED AT THIS TIME. MINOR TRACK OUT NOTED ON THE LOCAL STREETS WITHIN THE SUBDIVISION, BUT NOTHING BEING TRANSFERRED OFF SITE.
09/17/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued
08/20/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, SOME MINOR SEDIMENT AND DIRT HAS BEEN NOTED ON THE LOCAL STREETS, I WILL DISCUSS THIS ISSUE WITH THE CONTRACTOR.
08/06/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME
06/25/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION OF THE SITE. I DID CONTACT KYLE WITH KE&G CONSTRUCTION AND ASKED THAT HE CHECK THE OUTER PERIMETERS OF THE SITE TOO VERIFY THAT THEIR STORMWATER CONTROLS DO NOT NEED TO BE REPAIRED. IN THE PAST WEEKS THEY HAVE BEEN DRESSING THE OUTER SLOPES OF THE PADS AND HAVE ELIMINATED SOME OF THE CUT AND BERM CONTROLS THAT THEY HAVE HAD IN THE BEGINNING. I HAVE ALSO REMINDED HIM THAT THE MONSOON SEASON HAS STARTED, THEY NEED TO MAKE SURE THAT ALL THE SITES ARE READY TO HANDLE ANY STOTMS THAT MIGHT HAPPEN THIS SEASON. HE HAS ALSO BEEN REMINDED THAT DUE TO THE LARGE SITE THAT THEY ARE WORKING THE CONTRACTOR NEEDS TO ENSURE THAT THEY ARE CONTROLLING THE DUST ON EVERY SITE AS SPECIFIED IN THEIR DUST PERMIT WITH PIMA COUNTY DEPARTMENT OF ENVIRONMENTAL QUALITY.
05/28/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - NO CONCERNS AT THIS TIME, STORMWATER CONTROLS APPEAR TO BE WORKING AS NEEDED. REMEMBER TO MONITOR ALL OPEN SITES AT ALL TIMES TO ENSURE THAT BLOWING DUST IS KEPT TO A BARE MINIMUM, BLOWING DUST IS A CITABLE OFFENSE OFFENSE BY THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY AND MAY ALSO CAUSE A SHUTDOWN OF A SITE.
05/14/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - 6760 CONTINUED, NO CONCERNS AT THIS TIME.
04/16/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED NO CONCERNS AT THIS TIME
03/19/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - PARTIAL AT THIS TIME, TRACK OUT ROCK HAS BEEN INSTALLED AS NEEDED
03/04/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONCERNS APPARENT AT THIS TIME
01/06/2023 SITE - Stormwater Follow-up Complete (Recurring)
01/20/2023 SITE - Stormwater Follow-up Not Ready Complete all work on the side according to the approved plans prior to calling it in for final inspection
02/02/2024 SITE - Stormwater Follow-up Complete (Recurring) All set up and controls are in place, no concerns at this time.
02/06/2023 SITE - Stormwater Follow-up Complete (Recurring) David ditch and the waddles are in place no concerns at this time
02/17/2023 SITE - Stormwater Follow-up Complete (Recurring)
03/17/2023 SITE - Stormwater Follow-up Complete (Recurring)
05/01/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
05/10/2024 SITE - Stormwater Follow-up Complete (Recurring) This site has been inspected for the Stormwater and there are no concerns at this time. This site will be re-inspected next week to verify how close it is to being completed.
06/23/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time. Call in inspections every two weeks.
08/04/2023 SITE - Stormwater Follow-up Complete (Recurring) Stormwater setup and controls are in place, slight runoff in various locations within site.
09/01/2023 SITE - Stormwater Follow-up Complete (Recurring) Multiple areas on site have runoff on sidewalks, curbs, and streets that need to be addressed.
09/29/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
10/30/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time, call an inspection every two weeks through the remainder of the project
10/28/2022 SITE - Stormwater Follow-up Re-inspection required
12/09/2022 SITE - Stormwater Follow-up Complete (Recurring)
12/22/2023 SITE - Stormwater Follow-up Complete (Recurring) Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans.
12/23/2022 SITE - Stormwater Follow-up Complete (Recurring)