Permit: DP20-0194
Permit Details
Apply Date:
09/25/2020
Applicant:
Kyle Shepherd
Description:
GRADING/SWPPP - La Estancia, Phase 2, Parcel 5. Lots 1-97 and Common Areas A5, B5, C5, D5, E5, and F
Permit Reviews
Permit Number - DP20-0194
Permit Status: In revision
Permit Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 5. Lots 1-97 and Common Areas A5, B5, C5, D5, E5, and F
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/20/2021 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 07/30/2021 | COMPLETED |
07/30/2021 | REVISION - - 1ST | 08/02/2021 | COMPLETED |
08/27/2020 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 10/08/2020 | COMPLETED |
10/02/2020 | GRADING | 12/08/2020 | COMPLETED |
12/09/2020 | GRADING | 01/26/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP20-0194
Permit Status: In revision
Permit Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 5. Lots 1-97 and Common Areas A5, B5, C5, D5, E5, and F
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: DP20-0194
Permite Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 5. Lots 1-97 and Common Areas A5, B5, C5, D5, E5, and F
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2023 | ENGR Engineering Final | N/A | Not Ready | All site locations are noted, re - inspection required when completed per approved plans. |
10/27/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Provide the landscape plans that will be utilized for this site and all the other sites so that this work can be inspected and approved |
10/27/2023 | ENGR Grading Final | N/A | Not Ready | Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection. |
10/27/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | Ensure that all work is completed per the approved plans, and provide this department with the NOT Notice of Termination from the Arizona Department of Environment Quality for this Permit. What’s this information has been pre-AA inspection for this can be done and this portion of the permit can be approved. |
04/25/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Partial inspection, I need to complete the landscaping per plan. Replace all dead plants and remove debris from basins. |
05/10/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | This site has been inspected for the Stormwater and there are no concerns at this time. This site will be re-inspected next week to verify how close it is to being completed. |
Completed Inspections
Permit Status: In Revision
Permit Number: DP20-0194
Permit Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 5. Lots 1-97 and Common Areas A5, B5, C5, D5, E5, and F
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/20/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | N/A | |
02/06/2023 | SITE - Stormwater Setup and Controls | Passed | I’ll work has been completed for approved plans | |
03/17/2023 | COT - ENGR - Signage Final | Passed |