Permit Number - DP20-0183
Permit Status: Complete
Permit Description: SITE/GRADING - Earth's Healing.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2021 | DEV PKG - RESUBMITTAL | 02/03/2021 | COMPLETED |
| 03/29/2021 | DEV PKG - OK TO SUBMIT | 04/07/2021 | COMPLETED |
| 04/07/2021 | REVISION - - 1ST | 06/30/2021 | COMPLETED |
| 09/10/2021 | DEV PKG - OK TO SUBMIT | 10/06/2021 | COMPLETED |
| 09/14/2020 | DEV PKG - OK TO SUBMIT | 09/16/2020 | COMPLETED |
| 09/16/2020 | DEV PKG | 10/28/2020 | COMPLETED |
| 10/08/2021 | REVISION - - 2ND | 10/15/2021 | COMPLETED |
| 11/12/2020 | DEV PKG - RESUBMITTAL | 12/31/2020 | COMPLETED |
| 11/26/2021 | REVISION - - 2ND | 02/04/2022 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0183
Permit Description: SITE/GRADING - Earth's Healing.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - APPROVED} | |
| 09/02/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 09/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - APPROVED} | |
| 01/18/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: MERNANDEZ; Comment: Entered by VVERA1 - PARTIAL SOME OF THE TREES NEED TO BE STAKE} | |
| 01/18/2022 | ENGR Engineering Final | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: MERNANDEZ; Comment: Entered by VVERA1 - PARTIAL CONTACT DAVID ROBERTS FOR FINAL NEED TO MEET WITH DAVID ROBERTS } ; {Activity date: 09/02/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - PARTIAL, FINAL NOT TO BE GIVEN TILL THE ENGINEER OF RECORD HAS SUBMITTED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. THESE WILL INCLUDE BUT ARE NOT LIMITED TO: 1) FIRE SERVICE LOCATION HAS BEEN CHANGED FROM THE EAST SIDE OF THE DRIVEWAY TO THE WEST. 2) UNDERGROUND DETENTION BASIN WAS RELOCATED TO THE NORTH PARKING AREA FROM THE WEST PARKING AREA. 3) LONG TERM BICYCLE PARKING WILL BE LOCATED INSIDE THE NORTHERN LOCKED ENCLOSURE AREA. } |
|
| 01/18/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/18/2022 | ENGR Grading Final | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/18/2022 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/18/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 01/18/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |