Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/11/2022 |
ENGR Grading Final |
MERNANDEZ |
Approved |
Entered by VVERA1 - APPROVED |
| 04/09/2021 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED, NOTHING CHECKED DURING THIS INSPECTION. |
| 03/04/2021 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by VLEON1 - NOT READY AT THIS TIME. I MET WITH BARKER AND LOOKED OVER THIS SITE AT SOME OF THE MODIFICATIONS THAT THEY ARE WANTING TO DO. PORTIONS OF THE WORK WILL NEED TO BE APPROVED AND PERMITTED BY THE CITY OF TUCSON TRANSPORTATION DEPARTMENT BECAUSE THE CHAGES ARE WITHIN THE RIGHT OF WAY. THE CHANGES TO THE PARKING LOTS OR MODIFICATIONS WILL HAVE TO BE CHECKED BY THE ZONING AND ENGINEERING SECTIONS OF THE REVIEW STAFF. I HAVE ASKED BARKER TO CONTACT ELISA HAMBLIN AND STEVE SHIELDS FOR THE ZONING REQUIREMENTS AND STEPHEN BLOOD AND LOREN MAKUS FOR THE ENGINEERING APPROVALS. THE OWNERS OF THE SITE WILL BE LOOKING FOR A TCO PRIOR TO HAVING THE WORK ON THE BUILDING OR PARKING LOT COMPLETE. |
| 01/18/2022 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/18/2022 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/11/2022 |
ENGR Grading Final |
MERNANDEZ |
Partial Approval |
Entered by VVERA1 - PARTIAL CONTACT DAVID ROBERTS FOR FINALS |
| 04/15/2021 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by VLEON1 - PARTIAL AT THIS TIME, SITE WORK CONTINUES, CREWS ARE WORKING ON INSTALLING THE NEW PEDESTRIAN ACCESS AREAS FROM BENSON HWY TO THE NEW BUILDING, AND FROM THE TEMPORARY PARKING PARKING AREA TO THE NEW BUILDING. THEY ARE PLANNING ON HAVING THIS WORK COMPLETED BY TOMORROW, THEY WILL CALL IN ADDITIONAL INSPECTIONS FOR TOMORROW. |
| 04/13/2021 |
ENGR Grading Final |
MHERNANDEZ |
Partial Approval |
Entered by VLEON1 - PARTIAL ( DAVID ROBERTS WILL BE OUT HERE FOR RE-INSPECTION TODAY.)
|
| 04/09/2021 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED AT THIS TIME. WALKED THE SITE WITH THE CONTRACTOR AND JIM BURGE FROM THE BUILDING INSPECTION TO SEE HOW CLOSE THIS SITE IS FOR A TCO. CURRENTLY I HAVE ADVISED THE CONTRACTOR THAT ALL WORK WITHIN THE PEDESTRIAN PATHWAY FROM THE STREET AND THE PARKING LOTS WILL NEED TO BE COMPLETED OR WILL HAVE TO BE FENCED OFF FROM PEDESTRIAN ACCESS. ALSO THE CONTRACTOR WILL NEED TO ENSURE THAT THE RIGHT OF WAY PERMITS HAVE BEEN ISSUED FROM THE DEPARTMENT OF TRANSPORTATION FOR ALL WORK NEXT TO BENSON HIGHWAY IN THE ROW. THE INSPECTIONS FOR ENGINEERING ANS BUILDING WILL BE CALLED IN FOR BOTH THE COMBO AND DEVELOPMENT PACKAGE FOR TUESDAY OF NEXT WEEK.
|
| 01/18/2022 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 02/17/2021 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by RSALDAT1 - CN. Met WITH STEVE FROM BARKER CONSTRUCTION ABOUT THE PROJECT .AND HOE HE PAVE PART OF THE FRONT .AND INSTALL HANDICAP PARKING FIRST AND THEN THE SECOND PART LATER .
|