Permit: DP20-0183

Parcel: Unknown


Addresses:

2075 E BENSON HY

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/18/2022 ENGR Engineering Final DROBERTS Approved Entered by VVERA1 - APPROVED
01/11/2022 ENGR Engineering Final MERNANDEZ Partial Approval Entered by VVERA1 - PARTIAL CONTACT DAVID ROBERTS FOR FINAL NEED TO MEET WITH DAVID ROBERTS
09/02/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by NGARCIA3 - PARTIAL, FINAL NOT TO BE GIVEN TILL THE ENGINEER OF RECORD HAS SUBMITTED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. THESE WILL INCLUDE BUT ARE NOT LIMITED TO: 1) FIRE SERVICE LOCATION HAS BEEN CHANGED FROM THE EAST SIDE OF THE DRIVEWAY TO THE WEST. 2) UNDERGROUND DETENTION BASIN WAS RELOCATED TO THE NORTH PARKING AREA FROM THE WEST PARKING AREA. 3) LONG TERM BICYCLE PARKING WILL BE LOCATED INSIDE THE NORTHERN LOCKED ENCLOSURE AREA.
09/02/2021 ENGR Engineering Final DROBERTS Approved Entered by NGARCIA3 - APPROVED
04/15/2021 ENGR Engineering Final DROBERTS Partial Approval Entered by VLEON1 - PARTIALLY APPROVED AT THIS TIME, OK FOR A TCO FOR OCCUPANCY. FINAL NOT TO BE GIVEN TILL ALL WORK FOR THIS SITE IS COMPLETED PER THE APPROVED PLANS.