Permit Details

Status:
Issued
Type:
Development Package
Address:
348 E ELVADO RD
Address NEW:
348 E ELVADO RD
Apply Date:
09/02/2020
Applicant:
Description:
Site/Grading/Swppp - Tabernaculo Emanuel Church, accessory building, parking.

Permit Reviews

Permit Number - DP20-0172
Permit Status: Issued
Permit Description: Site/Grading/Swppp - Tabernaculo Emanuel Church, accessory building, parking.
Start Date Submittal Complete Date Status  
02/08/2022 GRADING 04/29/2022 COMPLETED Review Details
02/22/2021 DEV PKG - RESUBMITTAL 04/05/2021 COMPLETED Review Details
04/28/2021 DEV PKG - RESUBMITTAL 05/28/2021 COMPLETED Review Details
04/29/2022 DEV PKG - OK TO SUBMIT 06/16/2022 COMPLETED Review Details
06/16/2022 REVISION - - 1ST 06/24/2022 ACTIVE Review Details
08/04/2020 DEV PKG - OK TO SUBMIT 09/14/2020 COMPLETED Review Details
09/09/2020 DEV PKG 11/02/2020 COMPLETED Review Details
10/27/2022 DEVELOPMENT PACKAGE REVIEW v.1 12/06/2022 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP20-0172
Permite Description: Site/Grading/Swppp - Tabernaculo Emanuel Church, accessory building, parking.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
09/02/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 09/02/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 348 - CONTINUED,NO CONCERNS AT THIS TIME} ; {Activity date: 09/02/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 414 - CONTINUED,NO CONCERNS AT THIS TIME} ; {Activity date: 05/20/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 01/28/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - THERE ARE NO CONCERNS AT THIS TIME.} ; {Activity date: 12/03/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 12/03/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED NO CONCERNS AT THIS TIME} ; {Activity date: 11/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - ONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 11/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - ONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 10/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED NO CONCERNS AT THIS TIME} ; {Activity date: 10/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED NO CONCERNS AT THIS TIME} ; {Activity date: 10/08/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED AT THIS TIME, THERE ARE NO CONCERNS NOTED DURING THIS INSPECTION}
06/29/2023 Final inspection to ensure all landscape and water harvesting SITE N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 SITE - Zoning Final N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 COT - ENGR - Stormwater N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 PDSD Site/Engineering Division - Landscaping N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 PDSD Site/Engineering Division - NPPO N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 ENGR Engineering Final N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 SITE - Stormwater Final Inspection N/A Complete (Recurring) Dave Roberts will do the final inspection on this project
01/12/2023 SITE - Stormwater Setup and Controls N/A Complete (Recurring) The gates are locked no contractor on site need to reschedule

Completed Inspections

Permit Status: Issued
Permit Number: DP20-0172
Permit Description: Site/Grading/Swppp - Tabernaculo Emanuel Church, accessory building, parking.
Total Completed Inspections - 12
Date Description Inspector Results Comments
09/24/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - 9150 (ENGINEERING PRE-CONSTRUCTION) IS APPROVED AT THIS TIME

}
06/21/2023 COT - ENGR - Signage Final Passed
06/21/2023 ENGR Grading Final Passed
06/29/2023 COT - FCON - Fire - Final Passed gates only knox box installed with key to both gates.
07/06/2023 Final inspection to ensure all landscape and water harvesting SITE Passed
07/06/2023 SITE - Zoning Final Passed
07/06/2023 COT - ENGR - Stormwater Passed
07/07/2023 PDSD Site/Engineering Division - Landscaping Passed
07/07/2023 PDSD Site/Engineering Division - NPPO Passed
07/07/2023 ENGR Engineering Final Passed
07/07/2023 SITE - Stormwater Final Inspection Passed
07/07/2023 SITE - Stormwater Setup and Controls Passed

Documents

File Name Document Type  
APPROVED 3_DEVELOPMENT_PACKAGE_4-28-2021_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_DEVELOPMENT_PACKAGE_4-28-2021_V1.PDF DOCUMENTS VIEW
REV-1_COMMENT_LETTER.PDF PLANS UNDER REVIEW VIEW
REV-1_COMMENT.PDF PLANS UNDER REVIEW VIEW
REV-1_SHEET_S3_REVISION.PDF PLANS UNDER REVIEW VIEW
REV-1_SHEET S5_REVISION.PDF PLANS UNDER REVIEW VIEW
REV-1_ONLINE SUBMITTAL PAGE, RECVD 04.26.22.PDF PLANS UNDER REVIEW VIEW
PERMIT.PDF DOCUMENTS VIEW
1-10 OF 10.PDF DEVELOPMENT PACKAGE VIEW
COMMENT LETTER, 04.26.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD. 04.26.21.PDF DOCUMENTS VIEW
COMMENT_LETTER, 02.17.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 02.18.21 AT 10;00AM.PDF DOCUMENTS VIEW
DRAINAGE_REPORT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW