Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP20-0172

Parcel: 138170410


Addresses:

348 E ELVADO RD


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP20-0172

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
06/21/2023 ENGR Engineering Final Partial Pass Contractor needs to install filter fabric underneath riprap
06/21/2023 ENGR Engineering Final Partial Pass Contractor needs to install filter fabric underneath the riprap
06/29/2023 ENGR Engineering Final Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 ENGR Engineering Final Complete (Recurring) Dave Roberts will do the final inspection on this project
06/29/2023 ENGR Engineering Final Complete (Recurring) Dave Roberts will do the final inspection on this project
07/06/2023 ENGR Engineering Final Passed
07/07/2023 ENGR Engineering Final Passed
07/07/2023 ENGR Engineering Final Passed