Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 348 E ELVADO RD
Search
Parcel Attributes
| Parcel | 13817047C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | R-2, O-3 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 348 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 12/19/2025 1:20 p.m.
Total Number Of Rezone Cases - (3)
Permits
Address: 348 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Permits - (57)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| DP17-0275 | Complete | 11/21/2017 | 06/02/2019 | Development Package | SITE | |
| DP20-0172 | Issued | 09/02/2020 | 07/26/2026 | Development Package | Site/Grading/Swppp - Tabernaculo Emanuel Church, accessory building, parking. | |
| TC-RES-0224-00610 | Complete | 02/02/2024 | 08/03/2024 | BLDG 2 UNIT 2 | Residential Building - One or Two Family | Reconnect electrical service |
| DS18-02 | Approved | 01/08/2018 | N/A | Zoning Compliance | TSMR 8-01.5.1.4 AND 7-01.4.1.B | |
| T17BU00417 | FINAL | 08/30/2017 | 02/26/2018 | WALL/FEN | BUILD 6FT X 300FT WALL | |
| T17BU00436 | FINAL | 09/11/2017 | 05/14/2018 | DEMO | DEMO SFR | |
| T17OT00935 | ISSUED | 09/12/2017 | N/A | FLOODPLN | FUP FOR T17BU00436 | |
| T17OT01217 | ISSUED | 11/21/2017 | N/A | FLOODPLN | FUP FOR DP17-0275 | |
| T18CM00808 | C OF O | 02/01/2018 | 05/29/2019 | BLDG#1 | COMBO | NEW DUPLEX |
| T18CM00809 | C OF O | 02/01/2018 | 05/26/2019 | BLDG#2 | COMBO | NEW DUPLEX |
| T18CM00810 | C OF O | 02/01/2018 | 05/29/2019 | BLDG#3 | COMBO | NEW DUPLEX |
| T18CM00811 | C OF O | 02/01/2018 | 05/29/2019 | BLDG#4 | COMBO | NEW SFR |
| T18CM02835 | FINAL | 04/17/2018 | 10/22/2018 | COMBO | SEWER LINE REPLACEMENT | |
| T18FC00189 | FINAL | 03/05/2018 | 05/26/2019 | FIRECONS | BLDG 1 UNIT 1& 2 - owner/builder installed fire sprinkler system | |
| T18FC00190 | FINAL | 03/05/2018 | 05/26/2019 | FIRECONS | BLDG 2 UNIT 1& 2 - owner/builder installed fire sprinkler system | |
| T18FC00191 | FINAL | 03/05/2018 | 05/26/2019 | FIRECONS | BLDG 3 UNIT 1& 2 - owner/builder installed fire sprinkler system | |
| T18FC00192 | FINAL | 03/05/2018 | 05/26/2019 | FIRECONS | BLDG#4 - owner/builder installed fire sprinkler system 3BR | |
| T18OT00368 | ISSUED | 04/09/2018 | N/A | BLDG#1 | FLOODPLN | FUP for T18CM00808 |
| T18OT00369 | ISSUED | 04/09/2018 | N/A | BLDG#2 | FLOODPLN | FUP for T18CM00809 |
| T18OT00370 | ISSUED | 04/09/2018 | N/A | BLDG#3 | FLOODPLN | FUP for T18CM00810 |
| T18OT00371 | ISSUED | 04/09/2018 | N/A | BLDG#4 | FLOODPLN | FUP for T18CM00811 |
| T18RW01307 | FINAL | 03/19/2018 | 04/23/2018 | ROW | POTHOLING LOOKING SEWER HCS -OUTSIDE TRAVEL LANE | |
| T18RW01477 | FINAL | 04/02/2018 | 05/06/2018 | ROW | Installing new water service | |
| T18RW01621 | FINAL | 04/11/2018 | 05/13/2018 | ROW | 1802871 FRONT OF ADDRESS IN ASPHALT TO REPAIR SERVICE LINE | |
| T18RW01715 | FINAL | 04/17/2018 | 05/19/2018 | ROW | REPLACE SEWER PIPE AND INSTALL NEW HCS IN MIDDLE OF STREET | |
| T18RW01788 | FINAL | 04/20/2018 | 07/28/2018 | ROW | INSTALL 15 LF OF NATURAL GAS LINES WITHIN ELVADO RD RIGHT OF WAY PER ATTACHED SWG DESIGNS | |
| T18RW02675 | FINAL | 06/14/2018 | 10/11/2018 | ROW | (2) 5 X 5 BELLHOLES IN BLKTOP FRONT TO REPAIR/REPLACE GAS LINE, APPROX 8 FT TRENCH | |
| T18RW04083 | FINAL | 09/11/2018 | 10/11/2018 | ROW | TUCSON ELECTRIC POWER WILL BE INSTALLING A POWER LINE UNDER GROUND | |
| T18RW04785 | FINAL | 10/25/2018 | 12/06/2018 | ROW | EP Will be completing riser on pole and pulling primary cable into underground equipment on customer's property. TEP will be parking in ROW to do the work. | |
| T18RW05169 | FINAL | 11/19/2018 | 12/19/2018 | ROW | MAIL BOXES X2 , CURB CUTS, SIDEWALK, DRIVEWAY APRON, DUMPSTER APRON- 175' TOTAL | |
| T20RW05456 | FINAL | 10/06/2020 | 12/05/2020 | ROW | Starting on the N. side of E.LOS REALES RD W. of S. NOGALES HY remove and replace damaged strand and Coax going West for 575' NOTE: LOS REALES RD is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. ADDRESS ON APPLICATION WAS 309 E LOS REALES RD |
Plans
Address: 348 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Plans - (1)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-17-0275 | Active | 11/21/2017 | 06/02/2019 | -- Commercial Water Harvesting Ordinance | SITE |