Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13817047C
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-2, O-3
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 348 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Rezoning Cases

Date - 12/19/2025 1:20 p.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date
C9-85-84 H&R Ely - El Vado Road B-2A Closed 05/26/2010
C9-87-36 Ely - S. Nogales Highway B-2 Expired 12/16/2009
C9-87-36 Ely - S. Nogales Highway B-2A Expired 12/16/2009

Permits

Address: 348 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Permits - (57)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
DP17-0275 Complete 11/21/2017 06/02/2019 Development Package SITE
DP20-0172 Issued 09/02/2020 07/26/2026 Development Package Site/Grading/Swppp - Tabernaculo Emanuel Church, accessory building, parking.
TC-RES-0224-00610 Complete 02/02/2024 08/03/2024 BLDG 2 UNIT 2 Residential Building - One or Two Family Reconnect electrical service
DS18-02 Approved 01/08/2018 N/A Zoning Compliance TSMR 8-01.5.1.4 AND 7-01.4.1.B
T17BU00417 FINAL 08/30/2017 02/26/2018 WALL/FEN BUILD 6FT X 300FT WALL
T17BU00436 FINAL 09/11/2017 05/14/2018 DEMO DEMO SFR
T17OT00935 ISSUED 09/12/2017 N/A FLOODPLN FUP FOR T17BU00436
T17OT01217 ISSUED 11/21/2017 N/A FLOODPLN FUP FOR DP17-0275
T18CM00808 C OF O 02/01/2018 05/29/2019 BLDG#1 COMBO NEW DUPLEX
T18CM00809 C OF O 02/01/2018 05/26/2019 BLDG#2 COMBO NEW DUPLEX
T18CM00810 C OF O 02/01/2018 05/29/2019 BLDG#3 COMBO NEW DUPLEX
T18CM00811 C OF O 02/01/2018 05/29/2019 BLDG#4 COMBO NEW SFR
T18CM02835 FINAL 04/17/2018 10/22/2018 COMBO SEWER LINE REPLACEMENT
T18FC00189 FINAL 03/05/2018 05/26/2019 FIRECONS BLDG 1 UNIT 1& 2 - owner/builder installed fire sprinkler system
T18FC00190 FINAL 03/05/2018 05/26/2019 FIRECONS BLDG 2 UNIT 1& 2 - owner/builder installed fire sprinkler system
T18FC00191 FINAL 03/05/2018 05/26/2019 FIRECONS BLDG 3 UNIT 1& 2 - owner/builder installed fire sprinkler system
T18FC00192 FINAL 03/05/2018 05/26/2019 FIRECONS BLDG#4 - owner/builder installed fire sprinkler system 3BR
T18OT00368 ISSUED 04/09/2018 N/A BLDG#1 FLOODPLN FUP for T18CM00808
T18OT00369 ISSUED 04/09/2018 N/A BLDG#2 FLOODPLN FUP for T18CM00809
T18OT00370 ISSUED 04/09/2018 N/A BLDG#3 FLOODPLN FUP for T18CM00810
T18OT00371 ISSUED 04/09/2018 N/A BLDG#4 FLOODPLN FUP for T18CM00811
T18RW01307 FINAL 03/19/2018 04/23/2018 ROW POTHOLING LOOKING SEWER HCS -OUTSIDE TRAVEL LANE
T18RW01477 FINAL 04/02/2018 05/06/2018 ROW Installing new water service
T18RW01621 FINAL 04/11/2018 05/13/2018 ROW 1802871 FRONT OF ADDRESS IN ASPHALT TO REPAIR SERVICE LINE
T18RW01715 FINAL 04/17/2018 05/19/2018 ROW REPLACE SEWER PIPE AND INSTALL NEW HCS IN MIDDLE OF STREET
T18RW01788 FINAL 04/20/2018 07/28/2018 ROW INSTALL 15 LF OF NATURAL GAS LINES WITHIN ELVADO RD RIGHT OF WAY PER ATTACHED SWG DESIGNS
T18RW02675 FINAL 06/14/2018 10/11/2018 ROW (2) 5 X 5 BELLHOLES IN BLKTOP FRONT TO REPAIR/REPLACE GAS LINE, APPROX 8 FT TRENCH
T18RW04083 FINAL 09/11/2018 10/11/2018 ROW TUCSON ELECTRIC POWER WILL BE INSTALLING A POWER LINE UNDER GROUND
T18RW04785 FINAL 10/25/2018 12/06/2018 ROW EP Will be completing riser on pole and pulling primary cable into underground equipment on customer's property. TEP will be parking in ROW to do the work.
T18RW05169 FINAL 11/19/2018 12/19/2018 ROW MAIL BOXES X2 , CURB CUTS, SIDEWALK, DRIVEWAY APRON, DUMPSTER APRON- 175' TOTAL
T20RW05456 FINAL 10/06/2020 12/05/2020 ROW Starting on the N. side of E.LOS REALES RD W. of S. NOGALES HY remove and replace damaged strand and Coax going West for 575' NOTE: LOS REALES RD is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. ADDRESS ON APPLICATION WAS 309 E LOS REALES RD

Plans

Address: 348 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-17-0275 Active 11/21/2017 06/02/2019 -- Commercial Water Harvesting Ordinance SITE