Permit: DP20-0159
Permit Details
Status:
Inspections
Type:
Development Package
Address:
8500 E OLD VAIL RD
Address NEW:
8500 E OLD VAIL RD
Apply Date:
08/06/2020
Applicant:
David Shambach
Description:
SITE/GRADING - Optimum Inc, new building and driveway.
Permit Reviews
Permit Number - DP20-0159
Permit Status: Inspections
Permit Description: SITE/GRADING - Optimum Inc, new building and driveway.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/25/2021 | DEV PKG - RESUBMITTAL | 06/28/2021 | COMPLETED |
| 07/08/2020 | DEV PKG - OK TO SUBMIT | 08/10/2020 | COMPLETED |
| 08/10/2020 | DEV PKG | 09/24/2020 | COMPLETED |
| 08/18/2021 | DEV PKG - RESUBMITTAL | 10/04/2021 | COMPLETED |
| 10/21/2021 | DEV PKG - RESUBMITTAL | 11/02/2021 | COMPLETED |
| 06/07/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 07/12/2023 | REQUIRES RESUBMIT |
| 08/02/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 09/06/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP20-0159
Permite Description: SITE/GRADING - Optimum Inc, new building and driveway.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 04/16/2024 | SITE - Stormwater Setup and Controls | N/A | Not Ready | Met with Doug Walker and other Representatives for the Contractors and Representatives from the Transportation Department to discuss this site and how Construction will be done. They will start performing the work some where around June 5th. |
| 05/23/2024 | SITE - Stormwater Follow-up | N/A | Not Ready | Contractor start project around June 5 |
| 08/30/2024 | ENGR Grading Final | N/A | Not Ready | This site has been inspected and found to be not ready at this time according to the approved plans for this site. Complete the site and shown on the approved plans or provide revised drawings that have been approved for future site inspections. |
| 10/28/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for TCO of new modular building. |
Completed Inspections
Permit Status: Inspections
Permit Number: DP20-0159
Permit Description: SITE/GRADING - Optimum Inc, new building and driveway.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Met with Doug Walker and other Representatives for the Contractors and Representatives from the Transportation Department to discuss this site and how Construction will be done. They will start performing the work some where around June 5th. |