Permit Details

Status:
Complete
Type:
Development Package
Address:
4750 S PARK AV
Address NEW:
4750 S PARK AV
Apply Date:
06/10/2020
Applicant:
Description:
Site/Grading/SWPPP - 4760 S. Park Avenue, new office building.

Permit Reviews

Permit Number - DP20-0122
Permit Status: Complete
Permit Description: Site/Grading/SWPPP - 4760 S. Park Avenue, new office building.
Start Date Submittal Complete Date Status  
02/01/2021 REVISION - - 1ST 03/22/2021 COMPLETED Review Details
05/01/2020 DEV PKG - OK TO SUBMIT 06/12/2020 COMPLETED Review Details
06/12/2020 DEV PKG 07/14/2020 COMPLETED Review Details
08/07/2020 DEV PKG - RESUBMITTAL 09/17/2020 COMPLETED Review Details
09/17/2020 DEV PKG - RESUBMITTAL 09/24/2020 COMPLETED Review Details
12/01/2020 DEV PKG - OK TO SUBMIT 01/13/2021 COMPLETED Review Details
12/08/2020 REVISION - - 1ST 01/25/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0122
Permit Description: Site/Grading/SWPPP - 4760 S. Park Avenue, new office building.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/20/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/20/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/20/2021 SITE - Stormwater Follow-up Passed {Activity date: 09/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} ; {Activity date: 07/02/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 4750 S PARK AV NO CONCERNS AT THIS TIME} ; {Activity date: 07/02/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 4760 S PARK AV NO CONCERNS AT THIS TIME} ; {Activity date: 03/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 4760 S PARK AVE} ; {Activity date: 03/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 4750 S PARK AV} ; {Activity date: 03/09/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 4760 S PARK AVE: CONTINUED AT THIS TIME, NO CONCERNS DURING THIS INSPECTION. INSPECTION 09181 GRADING REBAR IS PARTIAL, OK TO GROUT THE 1ST 4 FEETOF THE WALL INSPECTION 09185 GRADING INTERMEDIATE CREWS WORKING ON THE BUILDING STRUCTURE GOING VERTICAL, PREPARING SUB GRADE, AND CONSTRUCTION OF THE TRASH ENCLOSURE.} ; {Activity date: 11/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. No issues or concerns at this time}
09/20/2021 SITE - Stormwater Final Inspection Passed {Activity date: 09/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/20/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 09/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/20/2021 COT - ENGR - Signage Final Passed {Activity date: 09/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
09/21/2021 ENGR Engineering Final Passed {Activity date: 09/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/20/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL, THE ROOF DRAINAGE FOR THE EAST SIDE OF THE BUILDING SOUTH OF THE MAIN ENTRANCE DRAINS INTO THE OPEN SPACE BETWEEN THE SIDEWALK AND THE BUILDING. A SCUPPER FOR THE AREA HAS BEEN PROVIDED THAT WILL NOT DRAIN THE AREA DURING ANY RAIN EVENT. CONSULT THE ENGINEER OF RECORD ABOUT THIS ISSUE TO SEE IF A REASONABLE SOLUTION CAN BE FOUND.}
09/21/2021 ENGR Grading Final Passed {Activity date: 09/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/21/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/06/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Preconstruction meeting conducted by Dave Roberts

} ; {Activity date: 10/06/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED AT THIS TIME. THE CONTRACTOR WILL BE SCHEDULING A SITE INTERMEDIATE GRADING INSPECTION FO THE LATTER PART OF MEXT WEEK ONCE THEY HAVE FINISHED SOME OF THEIR GRUBBING WORK.

} ; {Activity date: 10/06/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Not ready. No contact information provided. No activity on site at this time. Borderland and Chestnut construction vehicles on site.}

Documents

File Name Document Type  
ONLINE SUBMITTAL PAGE, 02.01.21.PDF DOCUMENTS VIEW
REVISION 1 RESPONSE LETTER, 02.01.21.PDF DOCUMENTS VIEW
REVISION 1 LETTER, 12.01.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
1-13 OF 13.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
ENGINEER TRANSMITTAL COVER SHEET.PDF DOCUMENTS VIEW
RESPONSE LETTER, 09.17.20.PDF DOCUMENTS VIEW
SWPPP WITH MAP, 332 PAGES.PDF DOCUMENTS VIEW
LANDSCAPE-RESP-LETTER.PDF DOCUMENTS VIEW
ENGINEER TRANSMITTAL SHEET.PDF DOCUMENTS VIEW
DEV PKG-RESP-LETTER1, 08.07.20.PDF DOCUMENTS VIEW
TRAFFIC STUDY.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
ENGINEER TRANSMITTAL SHEET, BAKER & ASSOC.PDF DOCUMENTS VIEW