Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/21/2021 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/06/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by JSCHNEI2 - Partially approved. Preconstruction meeting conducted by Dave Roberts
|
| 10/06/2020 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by JSCHNEI2 - APPROVED AT THIS TIME. THE CONTRACTOR WILL BE SCHEDULING A SITE INTERMEDIATE GRADING INSPECTION FO THE LATTER PART OF MEXT WEEK ONCE THEY HAVE FINISHED SOME OF THEIR GRUBBING WORK.
|
| 10/06/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Not ready. No contact information provided. No activity on site at this time. Borderland and Chestnut construction vehicles on site. |