Permit: DP20-0122

Parcel: Unknown


Addresses:

4750 S PARK AV

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
09/21/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by DROBERT5 -
10/06/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Preconstruction meeting conducted by Dave Roberts
10/06/2020 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by JSCHNEI2 - APPROVED AT THIS TIME. THE CONTRACTOR WILL BE SCHEDULING A SITE INTERMEDIATE GRADING INSPECTION FO THE LATTER PART OF MEXT WEEK ONCE THEY HAVE FINISHED SOME OF THEIR GRUBBING WORK.
10/06/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Not ready for Inspection Entered by VFLORES1 - Not ready. No contact information provided. No activity on site at this time. Borderland and Chestnut construction vehicles on site.