Permit: DP20-0122

Parcel: Unknown


Addresses:

4750 S PARK AV

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
09/20/2021 SITE - Stormwater Follow-up DROBERTS Approved Entered by VVERA1 - IS APPROVED
07/02/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - CONTINUED FOR 4750 S PARK AV NO CONCERNS AT THIS TIME
07/02/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - CONTINUED FOR 4760 S PARK AV NO CONCERNS AT THIS TIME
03/10/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 4760 S PARK AVE
03/10/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 4750 S PARK AV
03/09/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - 4760 S PARK AVE: CONTINUED AT THIS TIME, NO CONCERNS DURING THIS INSPECTION. INSPECTION 09181 GRADING REBAR IS PARTIAL, OK TO GROUT THE 1ST 4 FEETOF THE WALL INSPECTION 09185 GRADING INTERMEDIATE CREWS WORKING ON THE BUILDING STRUCTURE GOING VERTICAL, PREPARING SUB GRADE, AND CONSTRUCTION OF THE TRASH ENCLOSURE.
11/20/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by PAHUMAD1 - Continued. No issues or concerns at this time