Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
9411 E SPEEDWAY BL
Apply Date:
06/05/2020
Applicant:
Description:
Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.

Permit Reviews

Permit Number - DP20-0119
Permit Status: Issued
Permit Description: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
Start Date Submittal Complete Date Status  
05/07/2020 DEV PKG - OK TO SUBMIT 06/08/2020 COMPLETED Review Details
06/08/2020 DEV PKG 07/21/2020 COMPLETED Review Details
09/24/2020 DEV PKG - RESUBMITTAL 10/12/2020 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP20-0119
Permite Description: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
11/01/2021 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 11/01/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, MET WITH PART OF THE TEP. CREW TO DISCUSS WHAT IS NEEDED TO CLOSE OUT THE PERMIT. I WILL RESCHEDULE THIS SITE INSPECTION FOR TOMORROW AND ASK BRIAN TO LOOK OVER THE SITE AND FINAL OUT ALL ITEMS THAT CAN BE COMPLETED. THE LANDSCAPE AND GRADING FINAL WILL BE THE ITEMS THAT WILL BE LEFT OPEN TIL}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/18/2023 SITE - Stormwater Setup and Controls N/A Partial Pass drainage channel is blocked and needs to be cleared. disturbed are to south of drainage and sub-station needs to be hydro-seeded.
10/26/2022 PDSD Engineering Division Pre-Construction SITE N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP20-0119
Permit Description: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/18/2023 ENGR Grading Final Passed
10/18/2023 PDSD Engineering Division Pre-Construction SITE Passed

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
COT LETTER OF INTENT DP20-0119.PDF DOCUMENTS VIEW
1-31 OF 31.PDF DEVELOPMENT PACKAGE VIEW
COMMENT RESP LETTER, 09.24.20.PDF DOCUMENTS VIEW
CONDITIONS RESPONSE LETTER.PDF DOCUMENTS VIEW
DIFF GRADING - LETTERS SENT.PDF DOCUMENTS VIEW
DIFF GRADING - ATTACHMENTS SENT WITH LETTERS.PDF DOCUMENTS VIEW
DIFF GRADING - LETTERS RETURN RECEIPTS.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
PIMACOADDRESSING COMMENTS-RESPONSES.PDF DOCUMENTS VIEW
ENVIRONMENTAL RESOURCE REPORT_HARRISON.PDF DOCUMENTS VIEW
RECORDED PRIVATE SEWER EASEMENT, 08.04.20.PDF DOCUMENTS VIEW
ZONING EXAMINER DEC SE 15 66 TEP FINAL, APPROVAL.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 07.20.20.PDF DOCUMENTS VIEW
PIMACO ADDRESSING REVIEW, 07.17.20.PDF DOCUMENTS VIEW
APPLICATION SIGNED.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT .PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW