Permit: DP20-0119
Permit Details
Status:
Issued
Type:
Development Package
Address:
9411 E SPEEDWAY BL
Address NEW:
9411 E SPEEDWAY BL
Apply Date:
06/05/2020
Applicant:
Description:
Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
Permit Reviews
Permit Number - DP20-0119
Permit Status: Issued
Permit Description: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2020 | DEV PKG - OK TO SUBMIT | 06/08/2020 | COMPLETED |
| 06/08/2020 | DEV PKG | 07/21/2020 | COMPLETED |
| 09/24/2020 | DEV PKG - RESUBMITTAL | 10/12/2020 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0119
Permite Description: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2021 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 11/01/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, MET WITH PART OF THE TEP. CREW TO DISCUSS WHAT IS NEEDED TO CLOSE OUT THE PERMIT. I WILL RESCHEDULE THIS SITE INSPECTION FOR TOMORROW AND ASK BRIAN TO LOOK OVER THE SITE AND FINAL OUT ALL ITEMS THAT CAN BE COMPLETED. THE LANDSCAPE AND GRADING FINAL WILL BE THE ITEMS THAT WILL BE LEFT OPEN TIL} |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/18/2023 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | drainage channel is blocked and needs to be cleared. disturbed are to south of drainage and sub-station needs to be hydro-seeded. |
| 10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0119
Permit Description: Site/Grading/SWPPP/Floodplain - TEP Harrison Substation.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2023 | ENGR Grading Final | Passed | ||
| 10/18/2023 | PDSD Engineering Division Pre-Construction SITE | Passed |