Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 10/18/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
drainage channel is blocked and needs to be cleared. disturbed are to south of drainage and sub-station needs to be hydro-seeded. |