Permit: DP20-0093
Permit Details
Apply Date:
04/28/2020
Applicant:
Peter Salonga
Description:
SITE/GRADING - Door Church, worship center addition, Building 2.
Permit Reviews
Permit Number - DP20-0093
Permit Status: Complete
Permit Description: SITE/GRADING - Door Church, worship center addition, Building 2.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2020 | DEV PKG - OK TO SUBMIT | 04/29/2020 | COMPLETED |
04/01/2020 | DEV PKG - OK TO SUBMIT | 04/30/2020 | COMPLETED |
04/30/2020 | DEV PKG | 05/27/2020 | COMPLETED |
08/03/2020 | DEV PKG - RESUBMITTAL | 09/18/2020 | COMPLETED |
10/02/2020 | DEV PKG - RESUBMITTAL | 10/30/2020 | COMPLETED |
10/30/2020 | DEV PKG - RESUBMITTAL | 11/09/2020 | COMPLETED |
11/17/2020 | DEV PKG - RESUBMITTAL | 11/27/2020 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0093
Permit Description: SITE/GRADING - Door Church, worship center addition, Building 2.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/03/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/03/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET TO DISCUSS ON GOING WORK} | |
10/20/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 10/20/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} | |
02/14/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 09/24/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - PARTIAL APPROVAL AT THIS TIME FINAL NOT TO BE GIVEN TILL ALL WORK IS COMPLETED. } |
|
02/14/2022 | ENGR Engineering Final | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/10/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PARTIAL/ NEED TO REMOVE THE RIP RAP AND THE D G} ; {Activity date: 10/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} | |
02/14/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN} ; {Activity date: 09/30/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /BACK THE STORM DRAIN .THERE IS A REVISION ON THE PLANS .BUT THERE NO CITY STAMP.} ; {Activity date: 08/31/2021; Status: Continued; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - CN / CONTRACTOR HAVES A PROBLEM WITH THE STORM DRAIN PIPE ELEVATION .ENGINEER NEED TO REVIEW ELEVATIONS.} ; {Activity date: 08/23/2021; Status: Continued; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - CN ‘ STORM WATER IS GOOD AT IS TIME} ; {Activity date: 07/26/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /THERE A LOT OF STANDING WATE .THE CONSTRUCTION IS GOING TO PUMP THE WATER INTO THE STORM DRAIN ON IRVINGTON.} ; {Activity date: 06/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN } ; {Activity date: 06/08/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 05/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/05/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN EVERYTHING IN PLACE} ; {Activity date: 03/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN .NO ACTIVITY ON SITE TODAY RAIN DAY.} ; {Activity date: 02/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - MAINTENANCE ON THE WADDLES AND TRACKOUT ROCKS.} ; {Activity date: 02/02/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 01/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUED} ; {Activity date: 01/05/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE TRACK GOOD} ; {Activity date: 12/22/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED, NO CONCERNS AT THIS TIME, CREW HAS BEEN REMINDED TO RECALL THIS INSPECTION EVERY 2 WEEKS} ; {Activity date: 12/03/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} |
|
02/14/2022 | ENGR Grading Final | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
02/14/2022 | SITE - Stormwater Final Inspection | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} | |
02/14/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 09/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /INSTALLING RIP RAP INTHE CHANNEL AND INSTALL THE S R P TOO . ( PARTIAL )} ; {Activity date: 09/09/2021; Status: Continued; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - CN /RIP RAP ON THE NORTH EAST CORNER OF THE BUILDING. } ; {Activity date: 09/03/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - 9152 (STORMWATER INSTALL OF CONTROLS) NO CONCERNS AT THIS TINE} |
|
02/14/2022 | COT - ENGR - Signage Final | Passed | {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - PARTIAL} |