Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
04/28/2020
Applicant:
Peter Salonga
Description:
SITE/GRADING - Door Church, worship center addition, Building 2.

Permit Reviews

Permit Number - DP20-0093
Permit Status: Complete
Permit Description: SITE/GRADING - Door Church, worship center addition, Building 2.
Start Date Submittal Complete Date Status  
04/01/2020 DEV PKG - OK TO SUBMIT 04/29/2020 COMPLETED Review Details
04/01/2020 DEV PKG - OK TO SUBMIT 04/30/2020 COMPLETED Review Details
04/30/2020 DEV PKG 05/27/2020 COMPLETED Review Details
08/03/2020 DEV PKG - RESUBMITTAL 09/18/2020 COMPLETED Review Details
10/02/2020 DEV PKG - RESUBMITTAL 10/30/2020 COMPLETED Review Details
10/30/2020 DEV PKG - RESUBMITTAL 11/09/2020 COMPLETED Review Details
11/17/2020 DEV PKG - RESUBMITTAL 11/27/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0093
Permit Description: SITE/GRADING - Door Church, worship center addition, Building 2.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/03/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/03/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET TO DISCUSS ON GOING WORK}
10/20/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/20/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED}
02/14/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 09/24/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - PARTIAL APPROVAL AT THIS TIME FINAL NOT TO BE GIVEN TILL ALL WORK IS COMPLETED.

}
02/14/2022 ENGR Engineering Final Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/10/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PARTIAL/ NEED TO REMOVE THE RIP RAP AND THE D G} ; {Activity date: 10/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN}
02/14/2022 SITE - Stormwater Follow-up Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN} ; {Activity date: 09/30/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /BACK THE STORM DRAIN .THERE IS A REVISION ON THE PLANS .BUT THERE NO CITY STAMP.} ; {Activity date: 08/31/2021; Status: Continued; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - CN / CONTRACTOR HAVES A PROBLEM WITH THE STORM DRAIN PIPE ELEVATION .ENGINEER NEED TO REVIEW ELEVATIONS.} ; {Activity date: 08/23/2021; Status: Continued; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - CN ‘ STORM WATER IS GOOD AT IS TIME} ; {Activity date: 07/26/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /THERE A LOT OF STANDING WATE .THE CONSTRUCTION IS GOING TO PUMP THE WATER INTO THE STORM DRAIN ON IRVINGTON.} ; {Activity date: 06/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN

} ; {Activity date: 06/08/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 05/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/05/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN EVERYTHING IN PLACE} ; {Activity date: 03/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN .NO ACTIVITY ON SITE TODAY RAIN DAY.} ; {Activity date: 02/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - MAINTENANCE ON THE WADDLES AND TRACKOUT ROCKS.} ; {Activity date: 02/02/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 01/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUED} ; {Activity date: 01/05/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE TRACK GOOD} ; {Activity date: 12/22/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED, NO CONCERNS AT THIS TIME, CREW HAS BEEN REMINDED TO RECALL THIS INSPECTION EVERY 2 WEEKS} ; {Activity date: 12/03/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME}
02/14/2022 ENGR Grading Final Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/14/2022 SITE - Stormwater Final Inspection Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN}
02/14/2022 SITE - Stormwater Setup and Controls Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 09/16/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /INSTALLING RIP RAP INTHE CHANNEL AND INSTALL THE S R P TOO . ( PARTIAL )} ; {Activity date: 09/09/2021; Status: Continued; Inspector: MHERENANDEZ; Comment: Entered by NGARCIA3 - CN /RIP RAP ON THE NORTH EAST CORNER OF THE BUILDING.

} ; {Activity date: 09/03/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - 9152 (STORMWATER INSTALL OF CONTROLS) NO CONCERNS AT THIS TINE}
02/14/2022 COT - ENGR - Signage Final Passed {Activity date: 02/14/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - PARTIAL}

Documents

File Name Document Type  
PIMA CO WASTEWATER, APPROVAL LETTER, PUBLIC SEWER ACCEPTANCE.PDF DOCUMENTS VIEW
ADDRESS CHANGE LETTER, BUILDING 2, 09.07.21.PDF DOCUMENTS VIEW
1-17 OF 15 DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER DOCUMENTS VIEW
PERMIT DOCUMENTS VIEW
LANDSCAPE RESPONSE LETTER, 11.17.20.PDF DOCUMENTS VIEW
LANDSCAPE RESP TO COMMENTS, 10.30.20.PDF DOCUMENTS VIEW
RESP TO 2ND REVIEW, 10.02.20.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
RESPONSE TO 1ST REVIEW, 08.03.20.PDF DOCUMENTS VIEW
APPLICATION_SIGNED.PDF DOCUMENTS VIEW
SWPPP SET.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW