Permit: DP20-0093

Parcel: 14010029A


Addresses:

2950 E IRVINGTON RD

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
02/14/2022 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 -
10/13/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by NGARCIA3 - CN
09/30/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN /BACK THE STORM DRAIN .THERE IS A REVISION ON THE PLANS .BUT THERE NO CITY STAMP.
08/31/2021 SITE - Stormwater Follow-up MHERENANDEZ Continued Entered by NGARCIA3 - CN / CONTRACTOR HAVES A PROBLEM WITH THE STORM DRAIN PIPE ELEVATION .ENGINEER NEED TO REVIEW ELEVATIONS.
08/23/2021 SITE - Stormwater Follow-up MHERENANDEZ Continued Entered by NGARCIA3 - CN ‘ STORM WATER IS GOOD AT IS TIME
07/26/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN /THERE A LOT OF STANDING WATE .THE CONSTRUCTION IS GOING TO PUMP THE WATER INTO THE STORM DRAIN ON IRVINGTON.
06/16/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN
06/08/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 -
05/12/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 -
04/28/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 -
04/13/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 -
04/05/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN EVERYTHING IN PLACE
03/16/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 - CN .NO ACTIVITY ON SITE TODAY RAIN DAY.
02/25/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 - MAINTENANCE ON THE WADDLES AND TRACKOUT ROCKS.
02/02/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 -
01/20/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 - CONTINUED
01/05/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VLEON1 - CONTINUE TRACK GOOD
12/22/2020 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - IS CONTINUED, NO CONCERNS AT THIS TIME, CREW HAS BEEN REMINDED TO RECALL THIS INSPECTION EVERY 2 WEEKS
12/03/2020 SITE - Stormwater Follow-up DROBERTS Partial Approval Entered by DROBERT5 - NO CONCERNS AT THIS TIME