Permit: DP20-0063
Permit Details
Apply Date:
03/18/2020
Applicant:
Garland Shaw
Description:
TENTATIVE PLAT - Pantano Vista, lots 1 thru 32. Common areas 'A' (private streets and parking), 'B'
Permit Reviews
Permit Number - DP20-0063
Permit Status: Approved
Permit Description: TENTATIVE PLAT - Pantano Vista, lots 1 thru 32. Common areas 'A' (private streets and parking), 'B'
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/19/2020 | DEV PKG - OK TO SUBMIT | 03/24/2020 | COMPLETED |
03/23/2020 | TENTATIVE PLAT REVIEW | 04/29/2020 | COMPLETED |
09/10/2021 | TENTATIVE PLAT REVIEW | 09/17/2021 | COMPLETED |
09/16/2020 | TENTATIVE PLAT REVIEW | 11/04/2020 | COMPLETED |
12/11/2020 | TENTATIVE PLAT REVIEW | 02/03/2021 | COMPLETED |
10/13/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/20/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP20-0063
Permit Status: Approved
Permit Description: TENTATIVE PLAT - Pantano Vista, lots 1 thru 32. Common areas 'A' (private streets and parking), 'B'
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/13/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
11/20/2023 | Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's) |
Outstanding Inspections
Permit Status: Approved
Permit Number: DP20-0063
Permite Description: TENTATIVE PLAT - Pantano Vista, lots 1 thru 32. Common areas 'A' (private streets and parking), 'B'
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/27/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 05/27/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 02/16/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AS OF TODAY. 8325 E GOLF LINKS RD} ; {Activity date: 02/16/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AS OF TODAY. 8315 E GOLF LINKS RD} ; {Activity date: 02/02/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AS TODAY. 8325 E GOLF LINKS RD} ; {Activity date: 02/02/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN GOOD CONTRACTOR NOT ON SITE. 8315 E GOLF LINKS RD } ; {Activity date: 01/18/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / CONTINUE TO CLEAN AND GRUB.} ; {Activity date: 01/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN EVERYTHING GOOD AT IS TIME} ; {Activity date: 12/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. José, builders representative at 360-9049. Track out rock in place, waddle has been installed. } ; {Activity date: 12/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. José, builders representative at 360-9049. Track out rock in place, waddle has been installed.} ; {Activity date: 12/01/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /JUST STARTED CLEANING AND GRUBBING 8325 E GOLF LINKS RD} ; {Activity date: 12/01/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /JUST STARTED CLEANING AND GRUBBING 8315 E GOLF LINKS RD} |
09/27/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Contractor is going to reschedule |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
07/11/2024 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Everything still in place no concerns at this time |
08/13/2024 | ENGR Grading Final | N/A | Partial Pass | Contractor needs to finish the water harvesting area. Fix the erosion area at the basin change out the filter fabric underneath the riprap. |
08/13/2024 | ENGR Paving | N/A | Partial Pass | Contractor needs to stripe the parking handicap parking and set up the sign for the handicap parking |
11/21/2024 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Complete (Recurring) | Basin has been hydro seeded on the 20th of November. Basin is looking good. Construction is,ongoing on site so periodic inspections should be done. |
Completed Inspections
Permit Status: Approved
Permit Number: DP20-0063
Permit Description: TENTATIVE PLAT - Pantano Vista, lots 1 thru 32. Common areas 'A' (private streets and parking), 'B'
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2024 | COT - FCON - Fire - Final | Passed |