Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 06/27/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
cutting grad for roads and placing A B C |
| 08/13/2024 |
ENGR Grading Final |
|
Partial Pass |
Contractor needs to finish the water harvesting area. Fix the erosion area at the basin change out the filter fabric underneath the riprap. |
| 09/27/2023 |
ENGR Grading Final |
|
Not Ready |
Contractor is going to reschedule |
| 09/27/2023 |
ENGR Grading Final |
|
Not Ready |
Contractor is going to reschedule |
| 09/27/2023 |
ENGR Grading Final |
|
Not Ready |
Contractor is going to reschedule |
| 09/27/2023 |
ENGR Grading Final |
|
Not Ready |
Contractor is going to reschedule |