Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
Permit Number - DP20-0063
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - ENGR - Signage Final | Not Ready | ||
| 04/24/2025 | COT - ENGR - Signage Final | Not Applicable | There is no monument sign being installed | |
| 04/28/2025 | COT - ENGR - Signage Final | Not Ready | Access signs and street name signs are needed. | |
| 05/28/2025 | COT - ENGR - Signage Final | Passed | ||
| 09/27/2023 | COT - ENGR - Signage Final | Not Ready | Contractor is going to reschedule |