Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
03/06/2020
Applicant:
Brandy Burke
Description:
SITE/GRADING/SWPPP - Taco Bell at Tucson Marketplace.

Permit Reviews

Permit Number - DP20-0050
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Taco Bell at Tucson Marketplace.
Start Date Submittal Complete Date Status  
02/06/2020 DEV PKG - OK TO SUBMIT 03/10/2020 COMPLETED Review Details
03/10/2020 DEV PKG 04/29/2020 COMPLETED Review Details
06/01/2020 DEV PKG - RESUBMITTAL 07/01/2020 COMPLETED Review Details
07/13/2020 DEV PKG - RESUBMITTAL 08/21/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0050
Permit Description: SITE/GRADING/SWPPP - Taco Bell at Tucson Marketplace.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/08/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. Conversation with Richard Romero. Engineering does not look at site sewer. Only stormwater. Engineering cannot do a courtesy sewer inspection, contact Armando.

}
04/01/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/01/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/17/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN. INSTALLING WAYER LINES.} ; {Activity date: 09/21/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready}
04/01/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/01/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/17/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL}
04/01/2021 SITE - Stormwater Final Inspection Passed {Activity date: 04/01/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 09/23/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Please use grading intermediate for below ground stormwater piping. This inspection designation is specific for your SWPPP permit.
} ; {Activity date: 09/22/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready}
04/01/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 04/01/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 10/28/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. Controls installed at North East corner} ; {Activity date: 09/04/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Waddle installed as needed. Trackout protection at temporary entrance.}
04/01/2021 COT - ENGR - Signage Final Passed {Activity date: 04/01/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/17/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN. NO ADDRESS}
04/06/2021 ENGR Grading Final Passed {Activity date: 04/06/2021; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - }
04/07/2021 ENGR Engineering Final Passed {Activity date: 04/07/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/17/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL}
06/03/2021 SITE - Stormwater Follow-up Passed {Activity date: 06/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/04/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. No track out present. Protections in place. Large stock piles of material on site.

} ; {Activity date: 10/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continue. Please schedule stormwater follow up inspection biweekly} ; {Activity date: 10/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues or concerns at this time

} ; {Activity date: 09/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time} ; {Activity date: 09/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time} ; {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Barricades from private road have been removed.
} ; {Activity date: 09/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues.
} ; {Activity date: 09/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - continued. Barricades have been installed preparation of manhole connection. Private drive.} ; {Activity date: 09/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - . Continued. No issues. Controls are in place}

Documents

File Name Document Type  
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
1-20 OF 20.PDF DEVELOPMENT PACKAGE VIEW
OPTIMUS_COMMENT_AND_RESP_LTR, 07.13.20.PDF DOCUMENTS VIEW
ARC_STUDIOS_LANDSCAPE_RESPONSE_LETTER.PDF DOCUMENTS VIEW
ARC_STUDIOS_LANDSCAPE_RESPONSE_LETTER.PDF DOCUMENTS VIEW
DR APPROVAL LETTER 5-1-20, DESIGN REVIEW.PDF DOCUMENTS VIEW
OPTIMUS_COMMENT RESP LTR, 06.01.2020.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 04.29.2020.PDF DOCUMENTS VIEW
ADEQ_NOI_AZCN_80970_CERTIFICATE.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FINAL_DRAINAGE_REPORT.PDF DOCUMENTS VIEW
NATIVE_PLANT_APPLICATION.PDF DOCUMENTS VIEW